IAC logo
IAC Assessment: SF0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1995
Principal Product Tallow, Yellow Grease, Meat &Bone Meal
NAICS n/a
SIC 2077 - Animal And Marine Fats And Oils
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 5,500
Annual Production 108,000,000 Pounds
Production Hrs. Annual 4,680
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $285,785 2,303,634 kWh $0.12
Natural Gas $294,381 89,342 MMBtu $3.29
TOTAL ENERGY COSTS $580,166
RECOMMENDED SAVINGS* $297,017 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,062
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,622
Cost:
$1,540
$1,622 13,189 - - $1,622
13,189
kWh
-
-
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$384
Cost:
$150
- - $384 117 -
-
kWh
$384
117
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$834
Cost:
$576
- - $834 254 -
-
kWh
$834
254
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,243
Cost:
$19,840
- - $11,243 3,512 -
-
kWh
$11,243
3,512
MMBtu
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$18,222
Cost:
$2,100
$18,222 146,835 - - $18,222
146,835
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,019
Cost:
$28,800
$18,019 145,369 - - $18,019
145,369
kWh
-
-
MMBtu
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$243,737
Cost:
$345,500
$268,650 2,303,634 $(-24,913) (-16,691) $268,650
2,303,634
kWh
$(-24,913)
(-16,691)
MMBtu
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,956
Cost:
$4,084
$2,956 - - - $2,956
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$297,017
Cost:
$402,590
$309,469 2,609,027 $(-12,452) (-12,808) $309,469
2,609,027
kWh
$(-12,452)
(-12,808)
MMBtu
TOTAL IMPLEMENTED Savings:
$21,062
Cost:
$4,366
$19,844 160,024 $1,218 371 $19,844
160,024
kWh
$1,218
371
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas