IAC Assessment: SF0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1996
Principal Product Plastic Check Valves, Pumps
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 16
Plant Area (Sq.Ft.) 10,500
Annual Production 7,300,000 Pieces
Production Hrs. Annual 2,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,581 138,335 kWh $0.11
Electricity Demand $1,541 492 kW-months/year $3.13
TOTAL ENERGY COSTS $16,931
RECOMMENDED SAVINGS* $7,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,241
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$856
Cost:
$3,000
$1,191 11,137 $162 52 $(-497) (-66) - - $1,191
11,137
kWh
$162
52
kW-months/year
$(-497)
(-66)
MMBtu
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$905
Cost:
$1,082
$1,179 10,844 $68 21 $(-342) (-45) - - $1,179
10,844
kWh
$68
21
kW-months/year
$(-342)
(-45)
MMBtu
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$532
Cost:
$1,560
$475 4,396 $57 18 - - - - $475
4,396
kWh
$57
18
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,020
Cost:
$5,900
$1,733 16,413 $287 92 - - - - $1,733
16,413
kWh
$287
92
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,782
Cost:
$1,960
$1,686 16,120 $96 24 - - - - $1,686
16,120
kWh
$96
24
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$651
Cost:
$600
$616 5,862 $35 12 - - - - $616
5,862
kWh
$35
12
kW-months/year
-
-
MMBtu
-
-
lb
07: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$809
Cost:
$250
- - - - - - $809 13,760 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$809
13,760
lb
TOTAL RECOMMENDED Savings:
$7,555
Cost:
$14,352
$6,880 64,772 $705 219 $(-839) (-111) $809 13,760 $6,880
64,772
kWh
$705
219
kW-months/year
$(-839)
(-111)
MMBtu
$809
13,760
lb
TOTAL IMPLEMENTED Savings:
$5,241
Cost:
$10,832
$4,719 44,256 $552 177 $(-839) (-111) $809 13,760 $4,719
44,256
kWh
$552
177
kW-months/year
$(-839)
(-111)
MMBtu
$809
13,760
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)