IAC logo
IAC Assessment: SF0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1997
Principal Product Flexible Packaging
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 48,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,709 1,179,953 kWh $0.06
Electricity Demand $20,188 2,638 kW-months/year $7.65
Natural Gas $21,491 4,054 MMBtu $5.30
TOTAL ENERGY COSTS $125,713
RECOMMENDED SAVINGS* $1,056,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,956
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$492
Cost:
$546
$392 6,448 $100 13 - - - - - - $392
6,448
kWh
$100
13
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$375
Cost:
$763
$299 4,982 $76 10 - - - - - - $299
4,982
kWh
$76
10
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,601
Cost:
$1,204
$1,869 31,360 $478 62 $(-746) (-127) - - - - $1,869
31,360
kWh
$478
62
kW-months/year
$(-746)
(-127)
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,869
Cost:
$525
$2,869 143,611 - - - - - - - - $2,869
143,611
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$712
Cost:
-
$567 9,379 $145 19 - - - - - - $567
9,379
kWh
$145
19
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$25,000
Cost:
$250
- - - - - - $25,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,000
-
lb
-
-
$
07: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$1,025,000
Cost:
$10,000
- - - - - - - - $1,025,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,025,000
-
$
TOTAL RECOMMENDED Savings:
$1,056,049
Cost:
$13,288
$5,996 195,780 $799 104 $(-746) (-127) $25,000 - $1,025,000 - $5,996
195,780
kWh
$799
104
kW-months/year
$(-746)
(-127)
MMBtu
$25,000
-
lb
$1,025,000
-
$
TOTAL IMPLEMENTED Savings:
$28,956
Cost:
$1,538
$3,735 157,972 $221 29 - - $25,000 - - - $3,735
157,972
kWh
$221
29
kW-months/year
-
-
MMBtu
$25,000
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes