Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1997
Principal Product Newspaper
NAICS n/a
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 196
Plant Area (Sq.Ft.) 77,000
Annual Production 15,500,000 Pieces
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,545 1,312,427 kWh $0.06
Electricity Demand $50,132 4,469 kW-months/year $11.22
Natural Gas $8,069 1,443 MMBtu $5.59
TOTAL ENERGY COSTS $59,842
RECOMMENDED SAVINGS* $56,023 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,932
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,432
Cost:
$2,880
$844 14,361 $588 52 - - - - - - - - $844
14,361
kWh
$588
52
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,092
Cost:
$4,760
$628 10,844 $464 41 - - - - - - - - $628
10,844
kWh
$464
41
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$449
Cost:
$747
$250 4,396 $199 18 - - - - - - - - $250
4,396
kWh
$199
18
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$553
Cost:
$343
$290 4,982 $263 23 - - - - - - - - $290
4,982
kWh
$263
23
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$725
Cost:
$1,057
- - - - $725 - - - - - - - -
-
kWh
-
-
kW-months/year
$725
-
$
-
-
Tgal
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$246
Cost:
-
$169 2,931 $77 7 - - - - - - - - $169
2,931
kWh
$77
7
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$234
Cost:
$610
$123 2,052 $111 10 - - - - - - - - $123
2,052
kWh
$111
10
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$624
Cost:
$100
- - - - - - - - $624 9,984 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$624
9,984
lb
-
-
$
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$973
Cost:
-
- - - - - - - - $973 4,600 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$973
4,600
lb
-
-
$
10: 3.4151 MINIMIZE WATER USAGE Savings:
$853
Cost:
$1,962
- - - - - - $853 213,164 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$853
213,164
Tgal
-
-
lb
-
-
$
11: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$780
Cost:
$200
- - - - - - - - $780 12,480 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$780
12,480
lb
-
-
$
12: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$39,638
Cost:
$12,650
- - - - - - - - $39,638 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$39,638
-
lb
-
-
$
13: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$8,424
Cost:
-
- - - - - - - - - - $8,424 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
$8,424
-
$
TOTAL RECOMMENDED Savings:
$56,023
Cost:
$25,309
$2,304 39,566 $1,702 151 $725 - $853 213,164 $42,015 27,064 $8,424 - $2,304
39,566
kWh
$1,702
151
kW-months/year
$725
-
$
$853
213,164
Tgal
$42,015
27,064
lb
$8,424
-
$
TOTAL IMPLEMENTED Savings:
$3,932
Cost:
$3,762
$832 14,361 $650 58 - - $853 213,164 $1,597 14,584 - - $832
14,361
kWh
$650
58
kW-months/year
-
-
$
$853
213,164
Tgal
$1,597
14,584
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes