IAC Assessment: SF0135
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0135
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1998
Principal Product Telecommunications Equipment
NAICS n/a
SIC 3661 - Telephone And Telegraph Apparatus
Sales $50,000,000-$100,000,000
# of Employees 270
Plant Area (Sq.Ft.) 105,000
Annual Production 24,000 Pieces
Production Hrs. Annual 3,380
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,639 1,586,166 kWh $0.09
Electricity Demand $18,141 4,099 kW-months/year $4.43
Natural Gas $7,013 1,103 MMBtu $6.36
TOTAL ENERGY COSTS $211,121
RECOMMENDED SAVINGS* $47,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,219
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,024
Cost:
-
$1,024 12,016 - - - - - - $1,024
12,016
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,884
Cost:
$280
$5,884 68,288 - - - - - - $5,884
68,288
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,527
Cost:
$1,180
$2,226 25,791 - - $(-699) (-110) - - $2,226
25,791
kWh
-
-
kW-months/year
$(-699)
(-110)
MMBtu
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$415
Cost:
$329
$366 4,396 $49 11 - - - - $366
4,396
kWh
$49
11
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,572
Cost:
$1,742
$2,240 26,084 - - $(-668) (-105) - - $2,240
26,084
kWh
-
-
kW-months/year
$(-668)
(-105)
MMBtu
-
-
lb
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$9,888
Cost:
$13,781
$8,707 101,114 $1,181 267 - - - - $8,707
101,114
kWh
$1,181
267
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$258
Cost:
$1,700
$241 2,931 $17 3 - - - - $241
2,931
kWh
$17
3
kW-months/year
-
-
MMBtu
-
-
lb
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$804
Cost:
$1,792
$670 7,913 $134 30 - - - - $670
7,913
kWh
$134
30
kW-months/year
-
-
MMBtu
-
-
lb
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,036
Cost:
$8,557
$2,488 29,015 $548 124 - - - - $2,488
29,015
kWh
$548
124
kW-months/year
-
-
MMBtu
-
-
lb
10: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$11,710
Cost:
$250
- - - - - - $11,710 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,710
-
lb
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$8,504
Cost:
$250
- - - - - - $8,504 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,504
-
lb
12: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,003
Cost:
$250
- - - - - - $3,003 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,003
-
lb
TOTAL RECOMMENDED Savings:
$47,625
Cost:
$30,111
$23,846 277,548 $1,929 435 $(-1,367) (-215) $23,217 - $23,846
277,548
kWh
$1,929
435
kW-months/year
$(-1,367)
(-215)
MMBtu
$23,217
-
lb
TOTAL IMPLEMENTED Savings:
$19,219
Cost:
$2,572
$7,578 88,217 $134 30 - - $11,507 - $7,578
88,217
kWh
$134
30
kW-months/year
-
-
MMBtu
$11,507
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)