IAC logo
IAC Assessment: SF0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1998
Principal Product Mass Flow Meters
NAICS n/a
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 23,000
Annual Production 10,000 Pieces
Production Hrs. Annual 2,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,854 460,727 kWh $0.08
Electricity Demand $9,315 2,374 kW-months/year $3.92
Natural Gas $1,285 177 MMBtu $7.26
TOTAL ENERGY COSTS $52,931
RECOMMENDED SAVINGS* $6,218 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $744
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$800
Cost:
$400
$622 7,913 $178 45 $622
7,913
kWh
$178
45
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$813
Cost:
$1,920
$639 7,913 $174 44 $639
7,913
kWh
$174
44
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,861
Cost:
$9,165
$3,070 38,394 $791 200 $3,070
38,394
kWh
$791
200
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$744
Cost:
$3,630
$524 6,448 $220 56 $524
6,448
kWh
$220
56
kW-months/year
TOTAL RECOMMENDED Savings:
$6,218
Cost:
$15,115
$4,855 60,668 $1,363 345 $4,855
60,668
kWh
$1,363
345
kW-months/year
TOTAL IMPLEMENTED Savings:
$744
Cost:
$3,630
$524 6,448 $220 56 $524
6,448
kWh
$220
56
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand