Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1998 |
Principal Product | Electronic Wires and Cables |
NAICS | n/a |
SIC | 3357 - Nonferrous Wiredrawing & Insulating |
Sales | $10,000,000-$50,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 650,000 Pieces |
Production Hrs. Annual | 4,680 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $69,174 | 1,032,532 | kWh | $0.07 |
Electricity Demand | $23,116 | 4,480 | kW-months/year | $5.16 |
Natural Gas | $1,307 | 192 | MMBtu | $6.81 |
TOTAL ENERGY COSTS | $111,082 | |||
RECOMMENDED SAVINGS* | $19,900 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,362 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $927 Cost: - |
$844 | 12,603 | $83 | 16 | - | - | - | - | - | - |
$844 12,603 kWh |
$83 16 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $231 Cost: $204 |
$193 | 2,931 | $38 | 7 | - | - | - | - | - | - |
$193 2,931 kWh |
$38 7 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $408 Cost: $358 |
- | - | - | - | - | - | $408 | 21 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$408 21 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,692 Cost: $1,797 |
- | - | - | - | $1,692 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,692 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,101 Cost: $4,080 |
$1,656 | 24,619 | $445 | 86 | - | - | - | - | - | - |
$1,656 24,619 kWh |
$445 86 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,436 Cost: $3,582 |
$1,881 | 28,136 | $372 | 72 | - | - | $(-817) | (-120) | - | - |
$1,881 28,136 kWh |
$372 72 kW-months/year |
- - $ |
$(-817) (-120) MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,722 Cost: $17,970 |
$5,633 | 84,115 | $1,089 | 211 | - | - | - | - | - | - |
$5,633 84,115 kWh |
$1,089 211 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,999 Cost: $125 |
- | - | - | - | - | - | - | - | $2,999 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$2,999 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,307 Cost: - |
- | - | - | - | - | - | - | - | $1,307 | 65,280 |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$1,307 65,280 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,077 Cost: $9,025 |
- | - | - | - | - | - | - | - | $2,077 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$2,077 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $19,900 Cost: $37,141 |
$10,207 | 152,404 | $2,027 | 392 | $1,692 | - | $(-409) | (-99) | $6,383 | 65,280 | $10,207 152,404 kWh |
$2,027 392 kW-months/year |
$1,692 - $ |
$(-409) (-99) MMBtu |
$6,383 65,280 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,362 Cost: $3,707 |
$2,725 | 40,739 | $455 | 88 | - | - | $(-817) | (-120) | $2,999 | - | $2,725 40,739 kWh |
$455 88 kW-months/year |
- - $ |
$(-817) (-120) MMBtu |
$2,999 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) |