IAC logo
IAC Assessment: SF0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1998
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 95
Plant Area (Sq.Ft.) 39,000
Annual Production 200,000 Pieces
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,627 721,864 kWh $0.07
Electricity Demand $11,961 2,318 kW-months/year $5.16
Natural Gas $1,708 212 MMBtu $8.06
TOTAL ENERGY COSTS $66,237
RECOMMENDED SAVINGS* $207,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $203,685
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$690
Cost:
$15
$644 9,379 $46 9 - - - - $644
9,379
kWh
$46
9
kW-months/year
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$368
Cost:
-
$368 5,275 - - - - - - $368
5,275
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$555
Cost:
$495
$457 6,741 $98 19 - - - - $457
6,741
kWh
$98
19
kW-months/year
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$844
Cost:
$2,640
$643 9,379 $201 39 - - - - $643
9,379
kWh
$201
39
kW-months/year
-
-
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,333
Cost:
$5,522
$936 13,482 $397 77 - - - - $936
13,482
kWh
$397
77
kW-months/year
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,627
Cost:
$25,680
$4,544 66,237 $1,083 210 - - - - $4,544
66,237
kWh
$1,083
210
kW-months/year
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$780
Cost:
$145
- - - - $780 - - - -
-
kWh
-
-
kW-months/year
$780
-
lb
-
-
$
08: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$80,000
Cost:
$40,000
- - - - - - $80,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$80,000
-
$
09: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$117,000
Cost:
$400,000
- - - - - - $117,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$117,000
-
$
TOTAL RECOMMENDED Savings:
$207,197
Cost:
$474,497
$7,592 110,493 $1,825 354 $780 - $197,000 - $7,592
110,493
kWh
$1,825
354
kW-months/year
$780
-
lb
$197,000
-
$
TOTAL IMPLEMENTED Savings:
$203,685
Cost:
$465,695
$5,556 80,891 $1,129 219 - - $197,000 - $5,556
80,891
kWh
$1,129
219
kW-months/year
-
-
lb
$197,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes