Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1998 |
Principal Product | Printed Circuit Boards |
NAICS | n/a |
SIC | 3672 - Printed Circuit Boards |
Sales | $50,000,000-$100,000,000 |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 39,000 |
Annual Production | 200,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $49,627 | 721,864 | kWh | $0.07 |
Electricity Demand | $11,961 | 2,318 | kW-months/year | $5.16 |
Natural Gas | $1,708 | 212 | MMBtu | $8.06 |
TOTAL ENERGY COSTS | $66,237 | |||
RECOMMENDED SAVINGS* | $207,197 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $203,685 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $690 Cost: $15 |
$644 | 9,379 | $46 | 9 | - | - | - | - |
$644 9,379 kWh |
$46 9 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $368 Cost: - |
$368 | 5,275 | - | - | - | - | - | - |
$368 5,275 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $555 Cost: $495 |
$457 | 6,741 | $98 | 19 | - | - | - | - |
$457 6,741 kWh |
$98 19 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $844 Cost: $2,640 |
$643 | 9,379 | $201 | 39 | - | - | - | - |
$643 9,379 kWh |
$201 39 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,333 Cost: $5,522 |
$936 | 13,482 | $397 | 77 | - | - | - | - |
$936 13,482 kWh |
$397 77 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,627 Cost: $25,680 |
$4,544 | 66,237 | $1,083 | 210 | - | - | - | - |
$4,544 66,237 kWh |
$1,083 210 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $780 Cost: $145 |
- | - | - | - | $780 | - | - | - |
- - kWh |
- - kW-months/year |
$780 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.126 INSTALL SENSORS TO DETECT DEFECTS |
Savings: $80,000 Cost: $40,000 |
- | - | - | - | - | - | $80,000 | - |
- - kWh |
- - kW-months/year |
- - lb |
$80,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $117,000 Cost: $400,000 |
- | - | - | - | - | - | $117,000 | - |
- - kWh |
- - kW-months/year |
- - lb |
$117,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $207,197 Cost: $474,497 |
$7,592 | 110,493 | $1,825 | 354 | $780 | - | $197,000 | - | $7,592 110,493 kWh |
$1,825 354 kW-months/year |
$780 - lb |
$197,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $203,685 Cost: $465,695 |
$5,556 | 80,891 | $1,129 | 219 | - | - | $197,000 | - | $5,556 80,891 kWh |
$1,129 219 kW-months/year |
- - lb |
$197,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes |