IAC logo
IAC Assessment: SF0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Carpet Underlay
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 21,700,000 Pounds
Production Hrs. Annual 4,335
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,015 1,661,196 kWh $0.05
Electricity Demand $121,744 2,276 kW-months/year $53.49
Natural Gas $40,049 6,906 MMBtu $5.80
TOTAL ENERGY COSTS $267,289
RECOMMENDED SAVINGS* $51,221 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,764
Cost:
$144
$1,594 33,118 $1,170 92 - - - - - - $1,594
33,118
kWh
$1,170
92
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$434
Cost:
$167
$434 3,517 - - - - - - - - $434
3,517
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$553
Cost:
$881
- - - - $553 95 - - - - -
-
kWh
-
-
kW-months/year
$553
95
MMBtu
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$815
Cost:
$1,628
$527 8,206 $288 23 - - - - - - $527
8,206
kWh
$288
23
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$9,385
Cost:
$250
- - - - - - $9,385 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,385
-
lb
-
-
$
06: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$11,629
Cost:
$15,500
$(-1,381) (-11,430) - - - - - - $13,010 - $(-1,381)
(-11,430)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$13,010
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$25,641
Cost:
$41,432
- - - - - - $9,385 146,240 $16,256 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,385
146,240
lb
$16,256
-
$
TOTAL RECOMMENDED Savings:
$51,221
Cost:
$60,002
$1,174 33,411 $1,458 115 $553 95 $18,770 146,240 $29,266 - $1,174
33,411
kWh
$1,458
115
kW-months/year
$553
95
MMBtu
$18,770
146,240
lb
$29,266
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes