IAC Assessment: SF0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Printed Paper
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 96
Plant Area (Sq.Ft.) 66,000
Annual Production 49,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,948 2,151,817 kWh $0.06
Electricity Demand $92,162 2,945 kW-months/year $31.29
Natural Gas $594 75 MMBtu $7.92
TOTAL ENERGY COSTS $199,033
RECOMMENDED SAVINGS* $123,302 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,608
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,834
Cost:
$1,456
$1,040 16,706 $794 61 - - - - - - $1,040
16,706
kWh
$794
61
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,418
Cost:
$45,400
$10,534 169,109 $7,884 606 - - - - - - $10,534
169,109
kWh
$7,884
606
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$396
Cost:
$2,106
$283 4,689 $113 9 - - - - - - $283
4,689
kWh
$113
9
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,602
Cost:
-
- - - - $3,602 - - - - - -
-
kWh
-
-
kW-months/year
$3,602
-
lb
-
-
$
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$960
Cost:
$250
- - - - $960 - - - - - -
-
kWh
-
-
kW-months/year
$960
-
lb
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$19,132
Cost:
$49,350
- - - - $19,132 - - - - - -
-
kWh
-
-
kW-months/year
$19,132
-
lb
-
-
$
-
-
$
07: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$78,960
Cost:
$30,000
- - - - - - $(-32,760) - $111,720 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-32,760)
-
$
$111,720
-
$
TOTAL RECOMMENDED Savings:
$123,302
Cost:
$128,562
$11,857 190,504 $8,791 676 $23,694 - $(-32,760) - $111,720 - $11,857
190,504
kWh
$8,791
676
kW-months/year
$23,694
-
lb
$(-32,760)
-
$
$111,720
-
$
TOTAL IMPLEMENTED Savings:
$21,608
Cost:
$49,212
$11,857 190,504 $8,791 676 $960 - - - - - $11,857
190,504
kWh
$8,791
676
kW-months/year
$960
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost