IAC logo
IAC Assessment: SF0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Printed Labels
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 25,000
Annual Production 4,810 Units
Production Hrs. Annual 5,590
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,549 507,620 kWh $0.13
Natural Gas $3,078 454 MMBtu $6.78
TOTAL ENERGY COSTS $120,617
RECOMMENDED SAVINGS* $50,242 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,187
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,158
Cost:
$1,318
$766 6,448 $2,392 353 - - - - $766
6,448
kWh
$2,392
353
MMBtu
-
-
lb
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$547
Cost:
$1,344
$547 4,689 - - - - - - $547
4,689
kWh
-
-
MMBtu
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,661
Cost:
$4,765
$2,745 23,740 $(-1,084) (-160) - - - - $2,745
23,740
kWh
$(-1,084)
(-160)
MMBtu
-
-
lb
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$482
Cost:
$1,433
$641 5,569 $(-159) (-24) - - - - $641
5,569
kWh
$(-159)
(-24)
MMBtu
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,532
Cost:
$4,900
$1,532 13,189 - - - - - - $1,532
13,189
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,403
Cost:
$12,245
$3,403 29,308 - - - - - - $3,403
29,308
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 3.8141 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE Savings:
$17,794
Cost:
$14,320
$(-351) (-2,931) - - $18,145 - - - $(-351)
(-2,931)
kWh
-
-
MMBtu
$18,145
-
lb
-
-
$
08: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$21,665
Cost:
$272,034
- - - - - - $21,665 - -
-
kWh
-
-
MMBtu
-
-
lb
$21,665
-
$
TOTAL RECOMMENDED Savings:
$50,242
Cost:
$312,359
$9,283 80,012 $1,149 169 $18,145 - $21,665 - $9,283
80,012
kWh
$1,149
169
MMBtu
$18,145
-
lb
$21,665
-
$
TOTAL IMPLEMENTED Savings:
$4,187
Cost:
$4,095
$1,954 16,706 $2,233 329 - - - - $1,954
16,706
kWh
$2,233
329
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes