Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2000 |
Principal Product | Analog Telephones |
NAICS | n/a |
SIC | 3661 - Telephone And Telegraph Apparatus |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 37,000 |
Annual Production | 800,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $39,733 | 486,300 | kWh | $0.08 |
Electricity Demand | $7,118 | 1,584 | kW-months/year | $4.49 |
Natural Gas | $8,182 | 1,252 | MMBtu | $6.54 |
TOTAL ENERGY COSTS | $65,349 | |||
RECOMMENDED SAVINGS* | $6,974 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,385 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,145 Cost: $3,370 |
$894 | 10,948 | $251 | 56 | - | - | - | - |
$894 10,948 kWh |
$251 56 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $444 Cost: $1,100 |
$478 | 5,850 | $121 | 27 | $(-155) | (-25) | - | - |
$478 5,850 kWh |
$121 27 kW-months/year |
$(-155) (-25) MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $5,385 Cost: $150 |
- | - | - | - | - | - | $5,385 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,385 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $6,974 Cost: $4,620 |
$1,372 | 16,798 | $372 | 83 | $(-155) | (-25) | $5,385 | - | $1,372 16,798 kWh |
$372 83 kW-months/year |
$(-155) (-25) MMBtu |
$5,385 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,385 Cost: $150 |
- | - | - | - | - | - | $5,385 | - | - - kWh |
- - kW-months/year |
- - MMBtu |
$5,385 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |