IAC logo
IAC Assessment: SF0192
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0192
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2000
Principal Product Printed Circuit Board
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 360
Plant Area (Sq.Ft.) 62,000
Annual Production 0 Units
Production Hrs. Annual 6,898
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $592,479 6,884,320 kWh $0.09
Electricity Demand $117,606 11,668 kW-months/year $10.08
Natural Gas $5,429 843 MMBtu $6.44
TOTAL ENERGY COSTS $812,399
RECOMMENDED SAVINGS* $149,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,572
Cost:
$186
$2,572 34,041 - - - - - - $2,572
34,041
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,030
Cost:
$1,146
$6,030 76,767 - - - - - - $6,030
76,767
kWh
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$31,559
Cost:
$9,510
$31,559 416,563 - - - - - - $31,559
416,563
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,812
Cost:
$1,920
$1,812 20,315 - - - - - - $1,812
20,315
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,968
Cost:
$19,370
$12,968 167,701 - - - - - - $12,968
167,701
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,659
Cost:
$5,800
- - $2,659 148 - - - - -
-
kWh
$2,659
148
MMBtu
-
-
lb
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$848
Cost:
-
- - - - $848 - - - -
-
kWh
-
-
MMBtu
$848
-
lb
-
-
$
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$7,889
Cost:
$250
- - - - $7,889 - - - -
-
kWh
-
-
MMBtu
$7,889
-
lb
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$28,112
Cost:
$16,000
- - - - $28,112 - - - -
-
kWh
-
-
MMBtu
$28,112
-
lb
-
-
$
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$54,559
Cost:
$120,000
- - - - - - $54,559 - -
-
kWh
-
-
MMBtu
-
-
lb
$54,559
-
$
TOTAL RECOMMENDED Savings:
$149,008
Cost:
$174,182
$54,941 715,387 $2,659 148 $36,849 - $54,559 - $54,941
715,387
kWh
$2,659
148
MMBtu
$36,849
-
lb
$54,559
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes