IAC Assessment: SF0202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2000
Principal Product Drafting Paper
NAICS n/a
SIC 2672 - Paper Coated And Laminated, Nec
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 35,000
Annual Production 1,500,000 Pounds
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,652 268,860 kWh $0.10
Natural Gas $19,072 2,760 MMBtu $6.91
TOTAL ENERGY COSTS $62,645
RECOMMENDED SAVINGS* $22,697 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,241
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$698
Cost:
-
$698 6,786 - - - - $698
6,786
kWh
-
-
MMBtu
-
-
lb
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$960
Cost:
$600
$960 9,336 - - - - $960
9,336
kWh
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,800
Cost:
$11,610
$2,800 27,221 - - - - $2,800
27,221
kWh
-
-
MMBtu
-
-
lb
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$941
Cost:
$5,000
$941 9,149 - - - - $941
9,149
kWh
-
-
MMBtu
-
-
lb
05: 4.6230 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME Savings:
$5,583
Cost:
$2,180
- - $5,583 808 - - -
-
kWh
$5,583
808
MMBtu
-
-
lb
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$11,715
Cost:
$17,142
- - - - $11,715 - -
-
kWh
-
-
MMBtu
$11,715
-
lb
TOTAL RECOMMENDED Savings:
$22,697
Cost:
$36,532
$5,399 52,492 $5,583 808 $11,715 - $5,399
52,492
kWh
$5,583
808
MMBtu
$11,715
-
lb
TOTAL IMPLEMENTED Savings:
$7,241
Cost:
$2,780
$1,658 16,122 $5,583 808 - - $1,658
16,122
kWh
$5,583
808
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)