IAC logo
IAC Assessment: SF0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Injection Molded Plastic Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 25,000
Annual Production 10,000,000 Units
Production Hrs. Annual 6,396
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,404 877,560 kWh $0.10
Natural Gas $5,297 712 MMBtu $7.44
TOTAL ENERGY COSTS $103,650
RECOMMENDED SAVINGS* $16,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,891
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes
$ kWh $ lb $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$348
Cost:
-
$348 3,608 - - - - $348
3,608
kWh
-
-
lb
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$652
Cost:
$720
$652 6,277 - - - - $652
6,277
kWh
-
-
lb
-
-
$
03: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$395
Cost:
$495
$395 3,360 - - - - $395
3,360
kWh
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,858
Cost:
$4,793
$2,858 53,547 - - - - $2,858
53,547
kWh
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,032
Cost:
$5,880
$3,032 29,157 - - - - $3,032
29,157
kWh
-
-
lb
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$496
Cost:
$1,308
$496 4,770 - - - - $496
4,770
kWh
-
-
lb
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,435
Cost:
$13,442
$2,435 23,414 - - - - $2,435
23,414
kWh
-
-
lb
-
-
$
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$576
Cost:
-
- - $576 144 - - -
-
kWh
$576
144
lb
-
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,189
Cost:
$19,300
- - $5,189 27 - - -
-
kWh
$5,189
27
lb
-
-
$
10: 2.8112 COMBINE UTILITY METERS Savings:
$900
Cost:
$1,900
- - - - $900 - -
-
kWh
-
-
lb
$900
-
$
TOTAL RECOMMENDED Savings:
$16,881
Cost:
$47,838
$10,216 124,133 $5,765 171 $900 - $10,216
124,133
kWh
$5,765
171
lb
$900
-
$
TOTAL IMPLEMENTED Savings:
$1,891
Cost:
$2,523
$1,891 18,015 - - - - $1,891
18,015
kWh
-
-
lb
-
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes