IAC logo
IAC Assessment: SF0215
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0215
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Catalyst Pellets
NAICS n/a
SIC 3819 -
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 1,350,360
Annual Production 45,700,000 Pounds
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $813,683 16,537,220 kWh $0.05
Natural Gas $1,579,580 282,907 MMBtu $5.58
TOTAL ENERGY COSTS $2,439,231
RECOMMENDED SAVINGS* $951,630 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $292,968
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 3.7392 APPLY A PROTECTIVE COATING TO RACKS AND TANKS Savings:
$3,452
Cost:
-
$3,452 110,678 - - $3,452
110,678
kWh
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,984
Cost:
$4,574
$9,984 393,120 - - $9,984
393,120
kWh
-
-
lb
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,711
Cost:
$1,366
$1,711 35,997 - - $1,711
35,997
kWh
-
-
lb
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$12,982
Cost:
$13,500
$12,982 263,859 - - $12,982
263,859
kWh
-
-
lb
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$46,103
Cost:
$50,000
$46,103 1,816,214 - - $46,103
1,816,214
kWh
-
-
lb
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,758
Cost:
$3,291
$2,758 55,450 - - $2,758
55,450
kWh
-
-
lb
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,547
Cost:
$14,341
$6,547 133,067 - - $6,547
133,067
kWh
-
-
lb
08: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$5,806
Cost:
$14,760
$5,806 118,015 - - $5,806
118,015
kWh
-
-
lb
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,329
Cost:
$3,400
$1,329 52,416 - - $1,329
52,416
kWh
-
-
lb
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$33,374
Cost:
$128,000
$33,374 1,314,768 - - $33,374
1,314,768
kWh
-
-
lb
11: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$219,121
Cost:
-
- - $219,121 - -
-
kWh
$219,121
-
lb
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,216
Cost:
-
- - $3,216 - -
-
kWh
$3,216
-
lb
13: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$461,186
Cost:
$60,000
- - $461,186 - -
-
kWh
$461,186
-
lb
14: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$139,058
Cost:
$35,200
- - $139,058 - -
-
kWh
$139,058
-
lb
15: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,003
Cost:
$5,111
- - $5,003 - -
-
kWh
$5,003
-
lb
TOTAL RECOMMENDED Savings:
$951,630
Cost:
$333,543
$124,046 4,293,584 $827,584 - $124,046
4,293,584
kWh
$827,584
-
lb
TOTAL IMPLEMENTED Savings:
$292,968
Cost:
$77,317
$68,844 2,508,529 $224,124 - $68,844
2,508,529
kWh
$224,124
-
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)