IAC logo
IAC Assessment: SF0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Cement Dust
NAICS n/a
SIC 3241 - Cement, Hydraulic
Sales $50,000,000-$100,000,000
# of Employees 217
Plant Area (Sq.Ft.) 780,084
Annual Production 1,570,000 Tons
Production Hrs. Annual 8,064
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,707,019 70,000,620 kWh $0.04
Natural Gas $1,132,609 218,325 MMBtu $5.19
TOTAL ENERGY COSTS $3,951,653
RECOMMENDED SAVINGS* $5,006,210 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $131,098
#|Description Savings
Cost
Status Electricity Usage Coal Electricity Usage Coal
$ kWh $ MMBtu
01: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$83,016
Cost:
-
- - $83,016 55,619 -
-
kWh
$83,016
55,619
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$24,891
Cost:
$400
$24,891 643,685 - - $24,891
643,685
kWh
-
-
MMBtu
03: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$1,884
Cost:
$530
$1,884 57,751 - - $1,884
57,751
kWh
-
-
MMBtu
04: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$14,286
Cost:
$2,150
$14,286 63,165 - - $14,286
63,165
kWh
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,905
Cost:
$7,982
$8,905 200,297 - - $8,905
200,297
kWh
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$38,460
Cost:
$5,295
$38,460 1,168,163 - - $38,460
1,168,163
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$30,349
Cost:
$44,387
$30,349 1,147,850 - - $30,349
1,147,850
kWh
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$828
Cost:
$1,691
$828 21,403 - - $828
21,403
kWh
-
-
MMBtu
09: 2.5123 REDUCE FLUID FLOW RATES Savings:
$1,160
Cost:
$5,108
$1,160 29,991 - - $1,160
29,991
kWh
-
-
MMBtu
10: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$4,802,431
Cost:
$12,539,013
$4,802,431 59,531,882 - - $4,802,431
59,531,882
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,006,210
Cost:
$12,606,556
$4,923,194 62,864,187 $83,016 55,619 $4,923,194
62,864,187
kWh
$83,016
55,619
MMBtu
TOTAL IMPLEMENTED Savings:
$131,098
Cost:
$10,532
$48,082 907,147 $83,016 55,619 $48,082
907,147
kWh
$83,016
55,619
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Coal Electricity Usage Coal