IAC logo
IAC Assessment: SF0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Metal Ingots
NAICS n/a
SIC 3349 -
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 47,500
Annual Production 1,500,000 Pounds
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $315,916 2,622,620 kWh $0.12
Natural Gas $12,487 1,569 MMBtu $7.96
TOTAL ENERGY COSTS $333,224
RECOMMENDED SAVINGS* $29,828 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,133
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,760
Cost:
-
$3,760 31,200 - - $3,760
31,200
kWh
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,973
Cost:
$360
$1,973 16,377 - - $1,973
16,377
kWh
-
-
lb
03: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$1,846
Cost:
$495
$1,846 15,320 - - $1,846
15,320
kWh
-
-
lb
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$670
Cost:
$420
$670 5,696 - - $670
5,696
kWh
-
-
lb
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,703
Cost:
$2,200
$2,703 23,920 - - $2,703
23,920
kWh
-
-
lb
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$4,406
Cost:
$4,080
$4,406 36,575 - - $4,406
36,575
kWh
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,754
Cost:
$11,785
$7,754 64,352 - - $7,754
64,352
kWh
-
-
lb
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,572
Cost:
$6,779
$3,572 29,637 - - $3,572
29,637
kWh
-
-
lb
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$565
Cost:
$2,735
$565 4,687 - - $565
4,687
kWh
-
-
lb
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,579
Cost:
$15,374
- - $2,579 - -
-
kWh
$2,579
-
lb
TOTAL RECOMMENDED Savings:
$29,828
Cost:
$44,228
$27,249 227,764 $2,579 - $27,249
227,764
kWh
$2,579
-
lb
TOTAL IMPLEMENTED Savings:
$14,133
Cost:
$16,225
$14,133 117,304 - - $14,133
117,304
kWh
-
-
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)