IAC logo
IAC Assessment: SF0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 5,220,000
Annual Production 45,700 Thousand Feet
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $738,423 10,823,615 kWh $0.07
Natural Gas $595,458 216,816 MMBtu $2.75
TOTAL ENERGY COSTS $1,355,051
RECOMMENDED SAVINGS* $8,005,239 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $477,130
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$16,905
Cost:
-
$16,905 238,095 - - - - $16,905
238,095
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,094
Cost:
-
$2,094 36,585 - - - - $2,094
36,585
kWh
-
-
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$29,535
Cost:
$3,134
$29,535 415,990 - - - - $29,535
415,990
kWh
-
-
MMBtu
-
-
$
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$4,914
Cost:
$2,160
$4,914 69,204 - - - - $4,914
69,204
kWh
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,304
Cost:
$1,080
$1,304 14,205 - - - - $1,304
14,205
kWh
-
-
MMBtu
-
-
$
06: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$885
Cost:
$900
- - $885 350 - - -
-
kWh
$885
350
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,122
Cost:
$3,134
$3,122 43,972 - - - - $3,122
43,972
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,501
Cost:
$9,123
$7,501 105,641 - - - - $7,501
105,641
kWh
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$343
Cost:
$750
$343 4,830 - - - - $343
4,830
kWh
-
-
MMBtu
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,230
Cost:
$2,999
$1,230 17,327 - - - - $1,230
17,327
kWh
-
-
MMBtu
-
-
$
11: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$7,473,507
Cost:
$413,000
- - - - $7,473,507 - -
-
kWh
-
-
MMBtu
$7,473,507
-
$
12: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$450,000
Cost:
$50,000
- - - - $450,000 - -
-
kWh
-
-
MMBtu
$450,000
-
$
13: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,899
Cost:
$20,315
- - - - $13,899 - -
-
kWh
-
-
MMBtu
$13,899
-
$
TOTAL RECOMMENDED Savings:
$8,005,239
Cost:
$506,595
$66,948 945,849 $885 350 $7,937,406 - $66,948
945,849
kWh
$885
350
MMBtu
$7,937,406
-
$
TOTAL IMPLEMENTED Savings:
$477,130
Cost:
$57,274
$26,245 365,476 $885 350 $450,000 - $26,245
365,476
kWh
$885
350
MMBtu
$450,000
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes