IAC logo
IAC Assessment: SF0224
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0224
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Unit Dose inhalation solution
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 869
Plant Area (Sq.Ft.) 345,000
Annual Production 677,000,000 Units
Production Hrs. Annual 8,568
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,264,926 14,860,503 kWh $0.09
Natural Gas $246,694 39,282 MMBtu $6.28
TOTAL ENERGY COSTS $1,607,129
RECOMMENDED SAVINGS* $489,326 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,345
Cost:
$540
$9,345 112,455 - - - - $9,345
112,455
kWh
-
-
MMBtu
-
-
$
02: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$1,556
Cost:
-
- - $1,556 624 - - -
-
kWh
$1,556
624
MMBtu
-
-
$
03: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$2,618
Cost:
$172
$2,618 20,228 - - - - $2,618
20,228
kWh
-
-
MMBtu
-
-
$
04: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$18,526
Cost:
$4,994
$18,526 143,170 - - - - $18,526
143,170
kWh
-
-
MMBtu
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$10,562
Cost:
$3,240
$10,562 81,625 - - - - $10,562
81,625
kWh
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,146
Cost:
$2,800
$6,146 47,496 - - - - $6,146
47,496
kWh
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$25,962
Cost:
$13,200
- - $25,962 3,405 - - -
-
kWh
$25,962
3,405
MMBtu
-
-
$
08: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$11,660
Cost:
$9,500
$11,660 90,105 - - - - $11,660
90,105
kWh
-
-
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,142
Cost:
$6,113
$6,142 86,512 - - - - $6,142
86,512
kWh
-
-
MMBtu
-
-
$
10: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$259,156
Cost:
$256,500
$259,156 10,546,893 - - - - $259,156
10,546,893
kWh
-
-
MMBtu
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$17,495
Cost:
$33,556
$17,495 282,373 - - - - $17,495
282,373
kWh
-
-
MMBtu
-
-
$
12: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$120,158
Cost:
$160,000
- - - - $120,158 - -
-
kWh
-
-
MMBtu
$120,158
-
$
TOTAL RECOMMENDED Savings:
$489,326
Cost:
$490,615
$341,650 11,410,857 $27,518 4,029 $120,158 - $341,650
11,410,857
kWh
$27,518
4,029
MMBtu
$120,158
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes