Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2001 |
Principal Product | Steel Framing |
NAICS | n/a |
SIC | 3448 - Prefabricated Metal Buildings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 33,000 Units |
Production Hrs. Annual | 6,240 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $54,980 | 916,352 | kWh | $0.06 |
Natural Gas | $12,598 | 1,203 | MMBtu | $10.47 |
TOTAL ENERGY COSTS | $76,128 | |||
RECOMMENDED SAVINGS* | $884,001 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $839,026 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,362 Cost: - |
$1,362 | 22,698 | - | - | - | - |
$1,362 22,698 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $3,747 Cost: $1,200 |
$3,747 | 34,950 | - | - | - | - |
$3,747 34,950 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $44,975 Cost: $17,844 |
$44,975 | 419,547 | - | - | - | - |
$44,975 419,547 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $580 Cost: $4,298 |
$580 | 5,441 | - | - | - | - |
$580 5,441 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $1,077 Cost: $52 |
- | - | $1,077 | - | - | - |
- - kWh |
$1,077 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $807,300 Cost: $190,000 |
- | - | - | - | $807,300 | - |
- - kWh |
- - lb |
$807,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $24,960 Cost: $30,230 |
- | - | - | - | $24,960 | - |
- - kWh |
- - lb |
$24,960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $884,001 Cost: $243,624 |
$50,664 | 482,636 | $1,077 | - | $832,260 | - | $50,664 482,636 kWh |
$1,077 - lb |
$832,260 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $839,026 Cost: $225,780 |
$5,689 | 63,089 | $1,077 | - | $832,260 | - | $5,689 63,089 kWh |
$1,077 - lb |
$832,260 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Solid Waste (non-haz) | Administrative Changes |