IAC logo
IAC Assessment: SF0248
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0248
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2002
Principal Product Vanadium Catalyst
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 137,500
Annual Production 0 Units
Production Hrs. Annual 5,520
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,478 1,825,187 kWh $0.07
Electricity Demand $6,079 2,422 kW-months/year $2.51
Natural Gas $125,704 20,117 MMBtu $6.25
TOTAL ENERGY COSTS $288,649
RECOMMENDED SAVINGS* $21,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,125
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,662
Cost:
-
$1,662 14,856 - - $1,662
14,856
kWh
-
-
lb
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,169
Cost:
$1,436
$9,169 69,412 - - $9,169
69,412
kWh
-
-
lb
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,713
Cost:
$1,685
$1,713 12,630 - - $1,713
12,630
kWh
-
-
lb
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$5,341
Cost:
$6,000
$5,341 40,435 - - $5,341
40,435
kWh
-
-
lb
05: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$513
Cost:
$700
$513 3,885 - - $513
3,885
kWh
-
-
lb
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$2,409
Cost:
$13,000
$2,409 18,084 - - $2,409
18,084
kWh
-
-
lb
07: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$840
Cost:
-
- - $840 - -
-
kWh
$840
-
lb
TOTAL RECOMMENDED Savings:
$21,647
Cost:
$22,821
$20,807 159,302 $840 - $20,807
159,302
kWh
$840
-
lb
TOTAL IMPLEMENTED Savings:
$11,125
Cost:
$20,685
$11,125 86,005 - - $11,125
86,005
kWh
-
-
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)