IAC logo
IAC Assessment: SF0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Newspaper
NAICS 511110 - Newspaper Publishers
SIC 2711 - Newspapers
Sales $50,000,000-$100,000,000
# of Employees 625
Plant Area (Sq.Ft.) 156,000
Annual Production 0 Units
Production Hrs. Annual 3,328
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,845 5,065,104 kWh $0.04
Electricity Demand $96,904 11,094 kW-months/year $8.73
Natural Gas $22,528 3,608 MMBtu $6.24
TOTAL ENERGY COSTS $319,948
RECOMMENDED SAVINGS* $43,401 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,807
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,228
Cost:
$140
$878 23,919 $350 40 - - $878
23,919
kWh
$350
40
kW-months/year
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,649
Cost:
$3,715
$5,192 141,513 $4,457 510 - - $5,192
141,513
kWh
$4,457
510
kW-months/year
-
-
$
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$7,212
Cost:
$5,250
$5,866 159,896 $1,346 154 - - $5,866
159,896
kWh
$1,346
154
kW-months/year
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,226
Cost:
$3,400
$2,226 60,650 - - - - $2,226
60,650
kWh
-
-
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,416
Cost:
$13,464
$3,471 94,607 $2,945 337 - - $3,471
94,607
kWh
$2,945
337
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,302
Cost:
$7,220
$1,972 53,761 $1,330 152 - - $1,972
53,761
kWh
$1,330
152
kW-months/year
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$353
Cost:
$796
$252 6,871 $101 12 - - $252
6,871
kWh
$101
12
kW-months/year
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,337
Cost:
$587
$9,295 253,328 $3,042 348 - - $9,295
253,328
kWh
$3,042
348
kW-months/year
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$678
Cost:
$1,749
- - $215 20 $463 - -
-
kWh
$215
20
kW-months/year
$463
-
$
TOTAL RECOMMENDED Savings:
$43,401
Cost:
$36,321
$29,152 794,545 $13,786 1,573 $463 - $29,152
794,545
kWh
$13,786
1,573
kW-months/year
$463
-
$
TOTAL IMPLEMENTED Savings:
$3,807
Cost:
$4,336
$3,356 91,440 $451 52 - - $3,356
91,440
kWh
$451
52
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees