IAC logo
IAC Assessment: SF0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Elastomeric Rubber Products
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 100
Plant Area (Sq.Ft.) 70,000
Annual Production 0 Units
Production Hrs. Annual 2,860
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,192 1,439,362 kWh $0.09
Electricity Demand $45,804 11,017 kW-months/year $4.16
Natural Gas $136,551 23,069 MMBtu $5.92
TOTAL ENERGY COSTS $320,807
RECOMMENDED SAVINGS* $31,337 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,773
Cost:
$636
$2,930 33,417 $843 193 - - - - $2,930
33,417
kWh
$843
193
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$593
Cost:
$433
$474 5,410 $119 29 - - - - $474
5,410
kWh
$119
29
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,197
Cost:
$8,880
- - - - $11,197 1,891 - - -
-
kWh
-
-
kW-months/year
$11,197
1,891
MMBtu
-
-
lb
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,150
Cost:
$5,160
$1,739 19,834 $411 99 - - - - $1,739
19,834
kWh
$411
99
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$11,466
Cost:
$7,440
$9,002 102,680 $2,464 592 - - - - $9,002
102,680
kWh
$2,464
592
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$382
Cost:
$1,618
- - - - $382 65 - - -
-
kWh
-
-
kW-months/year
$382
65
MMBtu
-
-
lb
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$801
Cost:
$5,231
$629 7,177 $172 41 - - - - $629
7,177
kWh
$172
41
kW-months/year
-
-
MMBtu
-
-
lb
08: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$975
Cost:
$1,800
- - - - - - $975 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$975
-
lb
TOTAL RECOMMENDED Savings:
$31,337
Cost:
$31,198
$14,774 168,518 $4,009 954 $11,579 1,956 $975 - $14,774
168,518
kWh
$4,009
954
kW-months/year
$11,579
1,956
MMBtu
$975
-
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)