Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2003 |
Principal Product | Elastomeric Rubber Products |
NAICS | 326299 - All Other Rubber Product Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,860 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $126,192 | 1,439,362 | kWh | $0.09 |
Electricity Demand | $45,804 | 11,017 | kW-months/year | $4.16 |
Natural Gas | $136,551 | 23,069 | MMBtu | $5.92 |
TOTAL ENERGY COSTS | $320,807 | |||
RECOMMENDED SAVINGS* | $31,337 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,773 Cost: $636 |
$2,930 | 33,417 | $843 | 193 | - | - | - | - |
$2,930 33,417 kWh |
$843 193 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $593 Cost: $433 |
$474 | 5,410 | $119 | 29 | - | - | - | - |
$474 5,410 kWh |
$119 29 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $11,197 Cost: $8,880 |
- | - | - | - | $11,197 | 1,891 | - | - |
- - kWh |
- - kW-months/year |
$11,197 1,891 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,150 Cost: $5,160 |
$1,739 | 19,834 | $411 | 99 | - | - | - | - |
$1,739 19,834 kWh |
$411 99 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $11,466 Cost: $7,440 |
$9,002 | 102,680 | $2,464 | 592 | - | - | - | - |
$9,002 102,680 kWh |
$2,464 592 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $382 Cost: $1,618 |
- | - | - | - | $382 | 65 | - | - |
- - kWh |
- - kW-months/year |
$382 65 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $801 Cost: $5,231 |
$629 | 7,177 | $172 | 41 | - | - | - | - |
$629 7,177 kWh |
$172 41 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS |
Savings: $975 Cost: $1,800 |
- | - | - | - | - | - | $975 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$975 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,337 Cost: $31,198 |
$14,774 | 168,518 | $4,009 | 954 | $11,579 | 1,956 | $975 | - | $14,774 168,518 kWh |
$4,009 954 kW-months/year |
$11,579 1,956 MMBtu |
$975 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |