Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2003 |
Principal Product | Recycled Water, Tertiary Treated Wastewater |
NAICS | 221310 - Water Supply and Irrigation Systems |
SIC | 4941 - Water Supply |
Sales | $5,000,000-$10,000,000 |
# of Employees | 56 |
Plant Area (Sq.Ft.) | 1,500,000 |
Annual Production | 39,000 Thousand Gallons |
Production Hrs. Annual | 8,736 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $687,992 | 7,949,767 | kWh | $0.09 |
Electricity Demand | $184,631 | 19,284 | kW-months/year | $9.57 |
TOTAL ENERGY COSTS | $1,088,409 | |||
RECOMMENDED SAVINGS* | $359,834 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,680 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $10,511 Cost: - |
$7,305 | 84,455 | $3,206 | 288 | - | - |
$7,305 84,455 kWh |
$3,206 288 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $2,432 Cost: $580 |
$2,211 | 25,567 | $221 | 25 | - | - |
$2,211 25,567 kWh |
$221 25 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $121,871 Cost: $70,000 |
$105,793 | 1,223,040 | $16,078 | 1,680 | - | - |
$105,793 1,223,040 kWh |
$16,078 1,680 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,255 Cost: $3,120 |
$3,641 | 42,092 | $614 | 64 | - | - |
$3,641 42,092 kWh |
$614 64 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,169 Cost: $4,761 |
$5,413 | 62,583 | $756 | 87 | - | - |
$5,413 62,583 kWh |
$756 87 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $82,069 Cost: $76,562 |
$70,307 | 812,800 | $11,762 | 1,229 | - | - |
$70,307 812,800 kWh |
$11,762 1,229 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $29,851 Cost: $48,000 |
$25,913 | 299,574 | $3,938 | 411 | - | - |
$25,913 299,574 kWh |
$3,938 411 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,213 Cost: $27,140 |
$10,623 | 122,806 | $1,590 | 166 | - | - |
$10,623 122,806 kWh |
$1,590 166 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $5,950 Cost: $25,615 |
$5,165 | 59,715 | $785 | 82 | - | - |
$5,165 59,715 kWh |
$785 82 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $84,513 Cost: $145,200 |
- | - | - | - | $84,513 | - |
- - kWh |
- - kW-months/year |
$84,513 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $359,834 Cost: $400,978 |
$236,371 | 2,732,632 | $38,950 | 4,032 | $84,513 | - | $236,371 2,732,632 kWh |
$38,950 4,032 kW-months/year |
$84,513 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,680 Cost: $4,761 |
$12,718 | 147,038 | $3,962 | 375 | - | - | $12,718 147,038 kWh |
$3,962 375 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Solid Waste (non-haz) |