IAC logo
IAC Assessment: SF0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Canned chili and stew
NAICS 311613 - Rendering and Meat Byproduct Processing
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 140,000
Annual Production 90,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $410,447 3,650,015 kWh $0.11
Electricity Demand $122,086 9,247 kW-months/year $13.20
Natural Gas $569,925 80,788 MMBtu $7.05
LPG $1,223 88 MMBtu $13.90
TOTAL ENERGY COSTS $1,503,784
RECOMMENDED SAVINGS* $210,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,007
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$144,108
Cost:
$26,738
- - - - $144,108 27,074 - - -
-
kWh
-
-
kW-months/year
$144,108
27,074
MMBtu
-
-
lb
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,596
Cost:
$619
$1,287 11,442 $309 23 - - - - $1,287
11,442
kWh
$309
23
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,281
Cost:
$564
$995 8,840 $286 22 - - - - $995
8,840
kWh
$286
22
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,464
Cost:
$5,555
$4,879 43,369 $1,585 120 - - - - $4,879
43,369
kWh
$1,585
120
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,013
Cost:
$2,748
$2,274 20,212 $739 56 - - - - $2,274
20,212
kWh
$739
56
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$355
Cost:
$360
$209 1,858 $146 11 - - - - $209
1,858
kWh
$146
11
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,530
Cost:
$3,638
- - - - $2,530 389 - - -
-
kWh
-
-
kW-months/year
$2,530
389
MMBtu
-
-
lb
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,502
Cost:
$19,608
$6,099 54,211 $1,403 107 - - - - $6,099
54,211
kWh
$1,403
107
kW-months/year
-
-
MMBtu
-
-
lb
09: 2.1224 REPLACE BOILER Savings:
$39,608
Cost:
$155,089
- - - - $39,608 5,618 - - -
-
kWh
-
-
kW-months/year
$39,608
5,618
MMBtu
-
-
lb
10: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$4,190
Cost:
$6,871
- - $158 12 - - $4,032 2,601,000 -
-
kWh
$158
12
kW-months/year
-
-
MMBtu
$4,032
2,601,000
lb
TOTAL RECOMMENDED Savings:
$210,647
Cost:
$221,790
$15,743 139,932 $4,626 351 $186,246 33,081 $4,032 2,601,000 $15,743
139,932
kWh
$4,626
351
kW-months/year
$186,246
33,081
MMBtu
$4,032
2,601,000
lb
TOTAL IMPLEMENTED Savings:
$12,007
Cost:
$11,941
$7,153 63,581 $2,324 176 $2,530 389 - - $7,153
63,581
kWh
$2,324
176
kW-months/year
$2,530
389
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)