IAC logo
IAC Assessment: SF0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Wines
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 187,308
Annual Production 0 Units
Production Hrs. Annual 2,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $540,645 4,886,517 kWh $0.11
Electricity Demand $151,557 12,969 kW-months/year $11.69
Natural Gas $50,647 8,555 MMBtu $5.92
TOTAL ENERGY COSTS $805,255
RECOMMENDED SAVINGS* $220,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $68,639
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,947
Cost:
$18,680
$24,097 214,530 $10,850 851 - - - - - - - - $24,097
214,530
kWh
$10,850
851
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,323
Cost:
$960
$519 4,661 $804 61 - - - - - - - - $519
4,661
kWh
$804
61
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$768
Cost:
$609
$646 5,806 $122 10 - - - - - - - - $646
5,806
kWh
$122
10
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,123
Cost:
$17,490
$12,148 109,244 $1,975 150 - - - - - - - - $12,148
109,244
kWh
$1,975
150
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,098
Cost:
$7,305
$2,818 20,541 $280 64 - - - - - - - - $2,818
20,541
kWh
$280
64
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,307
Cost:
$3,200
$1,113 8,113 $194 44 - - - - - - - - $1,113
8,113
kWh
$194
44
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,167
Cost:
$16,382
$3,362 30,233 $805 61 - - - - - - - - $3,362
30,233
kWh
$805
61
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$419
Cost:
$2,640
$419 3,772 - - - - - - - - - - $419
3,772
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,660
Cost:
-
$(-214) (-1,920) $(-106) (-8) $(-102) - - - $14,082 - - - $(-214)
(-1,920)
kWh
$(-106)
(-8)
kW-months/year
$(-102)
-
$
-
-
$
$14,082
-
$
-
-
Tgal
10: 3.2172 USE AUTOMATIC CLEANING EQUIPMENT Savings:
$2,169
Cost:
$5,391
- - - - - - - - - - $2,169 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$2,169
-
Tgal
11: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$3,120
Cost:
$2,865
- - - - $3,120 - - - - - - - -
-
kWh
-
-
kW-months/year
$3,120
-
$
-
-
$
-
-
$
-
-
Tgal
12: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,997
Cost:
$2,695
- - $1,997 - - - - - - - - - -
-
kWh
$1,997
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
13: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$90,568
Cost:
$162,300
- - - - - - $90,568 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$90,568
-
$
-
-
$
-
-
Tgal
14: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$49,123
Cost:
$105,624
$(-19,938) (-179,297) $(-3,241) (-246) - - - - $72,302 - - - $(-19,938)
(-179,297)
kWh
$(-3,241)
(-246)
kW-months/year
-
-
$
-
-
$
$72,302
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$220,789
Cost:
$346,141
$24,970 215,683 $13,680 987 $3,018 - $90,568 - $86,384 - $2,169 - $24,970
215,683
kWh
$13,680
987
kW-months/year
$3,018
-
$
$90,568
-
$
$86,384
-
$
$2,169
-
Tgal
TOTAL IMPLEMENTED Savings:
$68,639
Cost:
$56,152
$40,331 360,520 $14,328 1,115 $(-102) - - - $14,082 - - - $40,331
360,520
kWh
$14,328
1,115
kW-months/year
$(-102)
-
$
-
-
$
$14,082
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption