IAC logo
IAC Assessment: SF0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Livestock Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 479,160
Annual Production 220,000 Tons
Production Hrs. Annual 6,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $378,702 4,018,709 kWh $0.09
Electricity Demand $77,749 10,515 kW-months/year $7.39
TOTAL ENERGY COSTS $468,865
RECOMMENDED SAVINGS* $49,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,907
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$9,390
Cost:
$380
$8,572 90,970 $818 111 - - $8,572
90,970
kWh
$818
111
kW-months/year
-
-
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,384
Cost:
$1,271
$3,856 40,918 $528 71 - - $3,856
40,918
kWh
$528
71
kW-months/year
-
-
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$976
Cost:
$286
$976 10,356 - - - - $976
10,356
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,934
Cost:
$1,230
$3,774 39,312 $280 54 $(-1,120) (-160) $3,774
39,312
kWh
$280
54
kW-months/year
$(-1,120)
(-160)
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$16,200
Cost:
$8,976
- - - - $16,200 2,314 -
-
kWh
-
-
kW-months/year
$16,200
2,314
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,600
Cost:
-
$3,166 33,598 $434 59 - - $3,166
33,598
kWh
$434
59
kW-months/year
-
-
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$503
Cost:
$824
- - - - $503 72 -
-
kWh
-
-
kW-months/year
$503
72
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,420
Cost:
$2,280
$1,250 13,267 $170 23 - - $1,250
13,267
kWh
$170
23
kW-months/year
-
-
MMBtu
09: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$8,089
Cost:
$19,616
$7,114 100,842 $975 132 - - $7,114
100,842
kWh
$975
132
kW-months/year
-
-
MMBtu
10: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,614
Cost:
$5,500
$1,419 7,492 $195 26 - - $1,419
7,492
kWh
$195
26
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$49,110
Cost:
$40,363
$30,127 336,755 $3,400 476 $15,583 2,226 $30,127
336,755
kWh
$3,400
476
kW-months/year
$15,583
2,226
MMBtu
TOTAL IMPLEMENTED Savings:
$9,907
Cost:
$4,375
$8,272 87,783 $1,132 153 $503 72 $8,272
87,783
kWh
$1,132
153
kW-months/year
$503
72
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas