IAC logo
IAC Assessment: SF0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Snack Pies
NAICS 311919 - Other Snack Food Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 56,000
Annual Production 100,000,000 Units
Production Hrs. Annual 5,616
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,578 1,977,743 kWh $0.11
Electricity Demand $58,258 4,472 kW-months/year $13.03
Natural Gas $70,779 13,033 MMBtu $5.43
TOTAL ENERGY COSTS $349,615
RECOMMENDED SAVINGS* $200,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,280
Cost:
$960
$1,151 10,547 $129 10 - - - - - - $1,151
10,547
kWh
$129
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,484
Cost:
$1,369
$2,051 18,785 $433 33 - - - - - - $2,051
18,785
kWh
$433
33
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,765
Cost:
$2,200
$1,477 13,539 $288 22 - - - - - - $1,477
13,539
kWh
$288
22
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$4,660
Cost:
$7,712
- - - - $4,660 863 - - - - -
-
kWh
-
-
kW-months/year
$4,660
863
MMBtu
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,906
Cost:
$260
- - - - - - $4,906 104,382 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,906
104,382
Tgal
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,400
Cost:
$24,250
- - - - - - - - $5,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,400
-
$
07: 3.2176 INCREASE USE OF AUTOMATION Savings:
$179,712
Cost:
$500,000
- - - - - - - - $179,712 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$179,712
-
$
TOTAL RECOMMENDED Savings:
$200,207
Cost:
$536,751
$4,679 42,871 $850 65 $4,660 863 $4,906 104,382 $185,112 - $4,679
42,871
kWh
$850
65
kW-months/year
$4,660
863
MMBtu
$4,906
104,382
Tgal
$185,112
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes