IAC Assessment: SF0269
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0269
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Dairy Product
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 0 Thousand Gallons
Production Hrs. Annual 4,992
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,127 568,799 kWh $0.08
Electricity Demand $7,606 1,434 kW-months/year $5.30
LPG $48,309 4,129 MMBtu $11.70
TOTAL ENERGY COSTS $104,286
RECOMMENDED SAVINGS* $19,342 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,288
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$5,192
Cost:
-
- - - - - - $5,192 145,068 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,192
145,068
MMBtu
02: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$635
Cost:
-
$602 7,938 $33 11 - - - - $602
7,938
kWh
$33
11
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,974
Cost:
-
$1,974 26,041 - - - - - - $1,974
26,041
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,516
Cost:
$3,984
- - - - - - $5,516 138,034 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,516
138,034
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,653
Cost:
-
$2,492 32,872 $161 53 - - - - $2,492
32,872
kWh
$161
53
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,739
Cost:
$3,905
$2,596 34,250 $143 47 - - - - $2,596
34,250
kWh
$143
47
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$633
Cost:
$1,743
- - $33 11 $600 7,907 - - -
-
kWh
$33
11
kW-months/year
$600
7,907
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$19,342
Cost:
$9,632
$7,664 101,101 $370 122 $600 7,907 $10,708 283,102 $7,664
101,101
kWh
$370
122
kW-months/year
$600
7,907
MMBtu
$10,708
283,102
MMBtu
TOTAL IMPLEMENTED Savings:
$3,288
Cost:
-
$3,094 40,810 $194 64 - - - - $3,094
40,810
kWh
$194
64
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG