IAC logo
IAC Assessment: SF0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Fabricated Metal Product Manufacturing
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3429 - Hardware, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 128,000
Annual Production 150,000 Pieces
Production Hrs. Annual 5,460
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,464 750,000 kWh $0.14
Electricity Demand $15,005 3,939 kW-months/year $3.81
Natural Gas $42,593 6,170 MMBtu $6.90
TOTAL ENERGY COSTS $162,061
RECOMMENDED SAVINGS* $38,127 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,747
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,205
Cost:
-
$9,205 68,066 - - - - $9,205
68,066
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$542
Cost:
-
$542 4,006 - - - - $542
4,006
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,425
Cost:
$190
$1,245 9,208 $180 47 - - $1,245
9,208
kWh
$180
47
kW-months/year
-
-
MMBtu
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,362
Cost:
$2,280
$3,748 27,707 $614 162 - - $3,748
27,707
kWh
$614
162
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$20,993
Cost:
$20,000
- - - - $20,993 3,042 -
-
kWh
-
-
kW-months/year
$20,993
3,042
MMBtu
06: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$1,079
Cost:
$812
- - - - $1,079 156 -
-
kWh
-
-
kW-months/year
$1,079
156
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$521
Cost:
$1,231
$456 3,369 $65 17 - - $456
3,369
kWh
$65
17
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$38,127
Cost:
$24,513
$15,196 112,356 $859 226 $22,072 3,198 $15,196
112,356
kWh
$859
226
kW-months/year
$22,072
3,198
MMBtu
TOTAL IMPLEMENTED Savings:
$9,747
Cost:
-
$9,747 72,072 - - - - $9,747
72,072
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas