IAC Assessment: SF0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2004
Principal Product Optical Broad band and video equipment
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3229 - Pressed And Blown Glass, Nec
Sales $100,000,000-$500,000,000
# of Employees 560
Plant Area (Sq.Ft.) 110,000
Annual Production 30,000 Pieces
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $933,669 7,409,600 kWh $0.13
Electricity Demand $41,117 13,298 kW-months/year $3.09
Natural Gas $70,858 9,046 MMBtu $7.83
TOTAL ENERGY COSTS $1,091,597
RECOMMENDED SAVINGS* $147,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,352
Cost:
$565
$2,271 19,002 $81 26 - - $2,271
19,002
kWh
$81
26
kW-months/year
-
-
lb
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$51,751
Cost:
$27,610
$49,979 418,585 $1,772 573 - - $49,979
418,585
kWh
$1,772
573
kW-months/year
-
-
lb
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,158
Cost:
$18,940
$16,953 144,988 $1,205 390 - - $16,953
144,988
kWh
$1,205
390
kW-months/year
-
-
lb
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$55,744
Cost:
$58,875
$53,931 428,363 $1,813 586 - - $53,931
428,363
kWh
$1,813
586
kW-months/year
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$977
Cost:
$3,120
$863 7,220 $114 37 - - $863
7,220
kWh
$114
37
kW-months/year
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,720
Cost:
$14,141
$3,237 27,113 $483 156 - - $3,237
27,113
kWh
$483
156
kW-months/year
-
-
lb
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$15,039
Cost:
$7,370
- - - - $15,039 - -
-
kWh
-
-
kW-months/year
$15,039
-
lb
TOTAL RECOMMENDED Savings:
$147,741
Cost:
$130,621
$127,234 1,045,271 $5,468 1,768 $15,039 - $127,234
1,045,271
kWh
$5,468
1,768
kW-months/year
$15,039
-
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)