IAC Assessment: SF0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2004
Principal Product Heat Treated Parts
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 21
Plant Area (Sq.Ft.) 25,000
Annual Production 500,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,996 127,642 kWh $0.68
Electricity Demand $38,524 7,466 kW-months/year $5.16
Natural Gas $38,524 29,736 MMBtu $1.30
TOTAL ENERGY COSTS $167,608
RECOMMENDED SAVINGS* $17,834 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,219
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes Electricity Usage Electricity Fees Personnel Changes
$ kWh $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$699
Cost:
-
$975 9,365 - - $(-276) - $975
9,365
kWh
-
-
$
$(-276)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,368
Cost:
$11,810
$11,368 109,196 - - - - $11,368
109,196
kWh
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,168
Cost:
$1,200
$1,168 11,222 - - - - $1,168
11,222
kWh
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,520
Cost:
$13,375
$3,520 33,806 - - - - $3,520
33,806
kWh
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,079
Cost:
$1,376
- - $1,079 - - - -
-
kWh
$1,079
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$17,834
Cost:
$27,761
$17,031 163,589 $1,079 - $(-276) - $17,031
163,589
kWh
$1,079
-
$
$(-276)
-
$
TOTAL IMPLEMENTED Savings:
$4,219
Cost:
$13,375
$4,495 43,171 - - $(-276) - $4,495
43,171
kWh
-
-
$
$(-276)
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees Personnel Changes Electricity Usage Electricity Fees Personnel Changes