IAC Assessment: SF0298
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0298
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product Newspapers
NAICS 511110 - Newspaper Publishers
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 84,000
Annual Production 74,000,000 Pieces
Production Hrs. Annual 4,108
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $386,210 3,871,255 kWh $0.10
Electricity Demand $130,729 11,584 kW-months/year $11.29
Natural Gas $46,147 5,425 MMBtu $8.51
TOTAL ENERGY COSTS $585,286
RECOMMENDED SAVINGS* $132,560 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$522
Cost:
-
$906 9,554 - - $(-384) - - - $906
9,554
kWh
-
-
kW-months/year
$(-384)
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,943
Cost:
$1,085
$1,647 18,190 $296 29 - - - - $1,647
18,190
kWh
$296
29
kW-months/year
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,803
Cost:
$2,432
$3,262 34,409 $541 48 - - - - $3,262
34,409
kWh
$541
48
kW-months/year
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$61,229
Cost:
$55,977
$52,687 555,825 $8,542 764 - - - - $52,687
555,825
kWh
$8,542
764
kW-months/year
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,856
Cost:
$24,003
$9,980 105,291 $6,876 615 - - - - $9,980
105,291
kWh
$6,876
615
kW-months/year
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,297
Cost:
$15,944
$3,196 33,710 $1,101 99 - - - - $3,196
33,710
kWh
$1,101
99
kW-months/year
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$43,910
Cost:
$29,800
- - - - - - $43,910 - -
-
kWh
-
-
kW-months/year
-
-
$
$43,910
-
$
TOTAL RECOMMENDED Savings:
$132,560
Cost:
$129,241
$71,678 756,979 $17,356 1,555 $(-384) - $43,910 - $71,678
756,979
kWh
$17,356
1,555
kW-months/year
$(-384)
-
$
$43,910
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes