IAC Assessment: SF0302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product Wooden Countertops
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2541 - Wood Partitions And Fixtures
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 35,000
Annual Production 624,000 Thousand Feet
Production Hrs. Annual 2,388
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,490 281,248 kWh $0.15
Natural Gas $2,231 203 MMBtu $10.99
TOTAL ENERGY COSTS $60,365
RECOMMENDED SAVINGS* $14,533 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,570
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$496
Cost:
-
$496 4,330 - - $496
4,330
kWh
-
-
lb
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,557
Cost:
$11,268
$7,557 51,444 - - $7,557
51,444
kWh
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$337
Cost:
$748
$337 2,295 - - $337
2,295
kWh
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$474
Cost:
$1,638
$474 3,224 - - $474
3,224
kWh
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$600
Cost:
$2,584
$600 4,083 - - $600
4,083
kWh
-
-
lb
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,069
Cost:
$15,913
$2,069 14,083 - - $2,069
14,083
kWh
-
-
lb
07: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$1,800
Cost:
$250
- - $1,800 - -
-
kWh
$1,800
-
lb
08: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$1,200
Cost:
-
- - $1,200 - -
-
kWh
$1,200
-
lb
TOTAL RECOMMENDED Savings:
$14,533
Cost:
$32,401
$11,533 79,459 $3,000 - $11,533
79,459
kWh
$3,000
-
lb
TOTAL IMPLEMENTED Savings:
$4,570
Cost:
$4,472
$1,570 11,637 $3,000 - $1,570
11,637
kWh
$3,000
-
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)