Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2005 |
Principal Product | Sweetened Condensed Milk, Pancake Syrup, Olive Oil Packaging |
NAICS | 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2023 - Dry, Condensed, Evaporated Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 12,500,000 Pounds |
Production Hrs. Annual | 4,125 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $109,306 | 698,160 | kWh | $0.16 |
Natural Gas | $63,335 | 7,195 | MMBtu | $8.80 |
TOTAL ENERGY COSTS | $238,341 | |||
RECOMMENDED SAVINGS* | $74,679 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,347 Cost: $480 |
$2,347 | 19,208 | - | - | - | - | - | - |
$2,347 19,208 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $728 Cost: $120 |
- | - | - | - | $728 | 83 | - | - |
- - kWh |
- - kW-months/year |
$728 83 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,633 Cost: $3,457 |
$3,155 | 25,841 | $478 | 111 | - | - | - | - |
$3,155 25,841 kWh |
$478 111 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $4,150 Cost: $2,900 |
$3,840 | (-7,966) | $310 | 72 | - | - | - | - |
$3,840 (-7,966) kWh |
$310 72 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,456 Cost: $1,635 |
$1,296 | 10,610 | $160 | 37 | - | - | - | - |
$1,296 10,610 kWh |
$160 37 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,570 Cost: $1,687 |
- | - | - | - | $1,570 | 179 | - | - |
- - kWh |
- - kW-months/year |
$1,570 179 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,218 Cost: $24,484 |
$11,987 | 98,175 | $1,231 | 286 | - | - | - | - |
$11,987 98,175 kWh |
$1,231 286 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $6,777 Cost: $18,995 |
$6,146 | 50,337 | $631 | 146 | - | - | - | - |
$6,146 50,337 kWh |
$631 146 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,603 Cost: $14,240 |
$2,274 | 18,623 | $329 | 76 | - | - | - | - |
$2,274 18,623 kWh |
$329 76 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.3123 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS |
Savings: $38,197 Cost: $66,900 |
- | - | - | - | - | - | $38,197 | 8,409 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$38,197 8,409 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $74,679 Cost: $134,898 |
$31,045 | 214,828 | $3,139 | 728 | $2,298 | 261 | $38,197 | 8,409 | $31,045 214,828 kWh |
$3,139 728 kW-months/year |
$2,298 261 MMBtu |
$38,197 8,409 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) |