IAC logo
IAC Assessment: SF0311
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0311
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product cereal and powdered beverages
NAICS 311230 - Breakfast Cereal Manufacturing
SIC 2043 - Cereal Breakfast Foods
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 280,000
Annual Production 120,000,000 Pounds
Production Hrs. Annual 5,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $721,695 19,665,480 kWh $0.04
Electricity Demand $392,712 43,652 kW-months/year $9.00
Natural Gas $1,129,873 163,100 MMBtu $6.93
TOTAL ENERGY COSTS $2,288,850
RECOMMENDED SAVINGS* $244,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $192,777
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$133,918
Cost:
-
- - - - $133,918 19,373 - - - - - - -
-
kWh
-
-
kW-months/year
$133,918
19,373
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,048
Cost:
-
$5,048 535 - - - - - - - - - - $5,048
535
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,110
Cost:
-
$1,110 103 - - - - - - - - - - $1,110
103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$24,768
Cost:
$2,108
- - - - $24,768 3,496 - - - - - - -
-
kWh
-
-
kW-months/year
$24,768
3,496
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,622
Cost:
$504
$1,073 100 $549 61 - - - - - - - - $1,073
100
kWh
$549
61
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,803
Cost:
$2,959
$4,101 381 $2,702 411 - - - - - - - - $4,101
381
kWh
$2,702
411
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,363
Cost:
$6,375
$6,123 569 $3,240 360 - - - - - - - - $6,123
569
kWh
$3,240
360
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$412
Cost:
$480
$272 25 $140 15 - - - - - - - - $272
25
kWh
$140
15
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,804
Cost:
$2,332
$447 42 $150 17 - - - - $1,207 - - - $447
42
kWh
$150
17
kW-months/year
-
-
MMBtu
-
-
lb
$1,207
-
$
-
-
$
10: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$3,402
Cost:
$5,030
- - - - $3,402 491 - - - - - - -
-
kWh
-
-
kW-months/year
$3,402
491
MMBtu
-
-
lb
-
-
$
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$456
Cost:
$693
$275 25 $181 21 - - - - - - - - $275
25
kWh
$181
21
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,102
Cost:
$18,405
$6,021 560 $3,081 342 - - - - - - - - $6,021
560
kWh
$3,081
342
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
13: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$345
Cost:
$658
$345 32 - - - - - - - - - - $345
32
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
14: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$22,029
Cost:
$46,851
- - - - $22,029 3,265 - - - - - - -
-
kWh
-
-
kW-months/year
$22,029
3,265
MMBtu
-
-
lb
-
-
$
-
-
$
15: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$3,118
Cost:
$13,200
- - - - - - - - - - $3,118 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$3,118
-
$
16: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,600
Cost:
-
- - - - - - $1,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,600
-
lb
-
-
$
-
-
$
17: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$19,680
Cost:
$12,330
- - - - - - $19,680 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,680
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$244,580
Cost:
$111,925
$24,815 2,372 $10,043 1,227 $184,117 26,625 $21,280 - $1,207 - $3,118 - $24,815
2,372
kWh
$10,043
1,227
kW-months/year
$184,117
26,625
MMBtu
$21,280
-
lb
$1,207
-
$
$3,118
-
$
TOTAL IMPLEMENTED Savings:
$192,777
Cost:
$20,813
$11,171 1,104 $3,240 360 $158,686 22,869 $19,680 - - - - - $11,171
1,104
kWh
$3,240
360
kW-months/year
$158,686
22,869
MMBtu
$19,680
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost One-time Revenue or Avoided Cost