IAC logo
IAC Assessment: SF0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product Poultry Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 217,800
Annual Production 182,000 Tons
Production Hrs. Annual 6,656
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,442 3,634,781 kWh $0.07
Electricity Demand $76,626 11,473 kW-months/year $6.68
Natural Gas $166,148 25,680 MMBtu $6.47
TOTAL ENERGY COSTS $503,850
RECOMMENDED SAVINGS* $20,842 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,719
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$679
Cost:
-
$679 16,496 - - - - - - $679
16,496
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,124
Cost:
$948
$1,452 22,277 $321 45 - - $351 - $1,452
22,277
kWh
$321
45
kW-months/year
-
-
MMBtu
$351
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,170
Cost:
$771
$906 11,351 $264 38 - - - - $906
11,351
kWh
$264
38
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,983
Cost:
$1,979
- - - - $1,983 305 - - -
-
kWh
-
-
kW-months/year
$1,983
305
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$187
Cost:
$480
$156 2,396 $31 4 - - - - $156
2,396
kWh
$31
4
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,140
Cost:
$3,079
$759 11,646 $381 53 - - - - $759
11,646
kWh
$381
53
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,370
Cost:
$50,000
- - - - $12,370 1,903 - - -
-
kWh
-
-
kW-months/year
$12,370
1,903
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,189
Cost:
$5,346
$994 15,253 $195 27 - - - - $994
15,253
kWh
$195
27
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$20,842
Cost:
$62,603
$4,946 79,419 $1,192 167 $14,353 2,208 $351 - $4,946
79,419
kWh
$1,192
167
kW-months/year
$14,353
2,208
MMBtu
$351
-
$
TOTAL IMPLEMENTED Savings:
$17,719
Cost:
$57,545
$4,187 67,773 $811 114 $12,370 1,903 $351 - $4,187
67,773
kWh
$811
114
kW-months/year
$12,370
1,903
MMBtu
$351
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes