IAC Assessment: SF0323
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0323
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2006
Principal Product Municipal Waste Containers
NAICS 326140 - Polystyrene Foam Product Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 45,000
Annual Production 450,000 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $384,254 7,350,154 kWh $0.05
Electricity Demand $86,862 14,747 kW-months/year $5.89
TOTAL ENERGY COSTS $471,116
RECOMMENDED SAVINGS* $158,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,150
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$8,385
Cost:
$4,000
$7,353 109,292 $1,032 175 $7,353
109,292
kWh
$1,032
175
kW-months/year
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,614
Cost:
$1,181
$5,614 83,316 - - $5,614
83,316
kWh
-
-
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,718
Cost:
$3,434
$5,617 83,490 $1,101 187 $5,617
83,490
kWh
$1,101
187
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,432
Cost:
$8,974
$3,876 57,617 $556 94 $3,876
57,617
kWh
$556
94
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,123
Cost:
$5,355
$1,923 49,839 $200 45 $1,923
49,839
kWh
$200
45
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$117,125
Cost:
$345,000
$111,892 1,663,133 $5,233 1,777 $111,892
1,663,133
kWh
$5,233
1,777
kW-months/year
07: 2.7145 INSTALL SKYLIGHTS Savings:
$13,832
Cost:
$47,430
$9,733 144,668 $4,099 696 $9,733
144,668
kWh
$4,099
696
kW-months/year
TOTAL RECOMMENDED Savings:
$158,229
Cost:
$415,374
$146,008 2,191,355 $12,221 2,974 $146,008
2,191,355
kWh
$12,221
2,974
kW-months/year
TOTAL IMPLEMENTED Savings:
$11,150
Cost:
$12,408
$9,493 141,107 $1,657 281 $9,493
141,107
kWh
$1,657
281
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand