IAC logo
IAC Assessment: SF0336
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0336
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2006
Principal Product Drugs of Abuse Test Kits
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2835 - Diagnostic Substances
Sales $50,000,000-$100,000,000
# of Employees 270
Plant Area (Sq.Ft.) 110,000
Annual Production 45,000,000 Pieces
Production Hrs. Annual 2,340
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $419,309 4,532,100 kWh $0.09
Electricity Demand $128,641 9,396 kW-months/year $13.69
Natural Gas $83,604 7,044 MMBtu $11.87
TOTAL ENERGY COSTS $673,492
RECOMMENDED SAVINGS* $31,471 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,812
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$16
Cost:
-
$16 180 - - $16
180
kWh
-
-
kW-months/year
02: 2.7314 REDUCE VENTILATION AIR Savings:
$202
Cost:
-
$202 2 - - $202
2
kWh
-
-
kW-months/year
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$882
Cost:
$24,000
$882 882 - - $882
882
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,827
Cost:
$5,934
$8 94 $2,819 172 $8
94
kWh
$2,819
172
kW-months/year
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$22,164
Cost:
$15,000
$10 109 $22,154 1,350 $10
109
kWh
$22,154
1,350
kW-months/year
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$31
Cost:
$29,700
$31 - - - $31
-
kWh
-
-
kW-months/year
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$883
Cost:
$4,374
$3 38 $880 54 $3
38
kWh
$880
54
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$872
Cost:
$2,849
$2 30 $870 53 $2
30
kWh
$870
53
kW-months/year
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2
Cost:
$7,040
$1 15,233 $1 780 $1
15,233
kWh
$1
780
kW-months/year
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$234
Cost:
$557
$142 1 $92 6 $142
1
kWh
$92
6
kW-months/year
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$955
Cost:
$2,480
$499 5 $456 28 $499
5
kWh
$456
28
kW-months/year
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,076
Cost:
$16,625
$2 24 $2,074 126 $2
24
kWh
$2,074
126
kW-months/year
13: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$327
Cost:
$6,381
$95 10 $232 14 $95
10
kWh
$232
14
kW-months/year
TOTAL RECOMMENDED Savings:
$31,471
Cost:
$114,940
$1,893 16,608 $29,578 2,583 $1,893
16,608
kWh
$29,578
2,583
kW-months/year
TOTAL IMPLEMENTED Savings:
$3,812
Cost:
$33,083
$957 15,455 $2,855 954 $957
15,455
kWh
$2,855
954
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand