IAC Assessment: SF0346
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0346
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2007
Principal Product Coffee, Tea, Beer
NAICS 311920 - Coffee and Tea Manufacturing
SIC 2095 - Roasted Coffee
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 85,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,138 1,040,009 kWh $0.11
Electricity Demand $24,687 3,014 kW-months/year $8.19
Electricity Fees $12,298 - $ -
Natural Gas $342,988 36,189 MMBtu $9.48
TOTAL ENERGY COSTS $497,111
RECOMMENDED SAVINGS* $111,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,744
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,744
Cost:
$100
$1,402 12,468 $342 40 - - - - $1,402
12,468
kWh
$342
40
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$474
Cost:
$262
$474 4,217 - - - - - - $474
4,217
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,014
Cost:
$1,859
$3,537 31,450 $1,159 144 - - $(-2,682) (-134) $3,537
31,450
kWh
$1,159
144
kW-months/year
-
-
MMBtu
$(-2,682)
(-134)
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,284
Cost:
$1,620
$1,060 9,424 $224 28 - - - - $1,060
9,424
kWh
$224
28
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,090
Cost:
$11,740
$7,190 63,936 $900 112 - - - - $7,190
63,936
kWh
$900
112
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,037
Cost:
$1,863
$790 7,030 $247 31 - - - - $790
7,030
kWh
$247
31
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$96,586
Cost:
$193,493
- - - - $96,586 10,188 - - -
-
kWh
-
-
kW-months/year
$96,586
10,188
MMBtu
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$721
Cost:
$1,875
$547 4,867 $174 22 - - - - $547
4,867
kWh
$174
22
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$111,950
Cost:
$212,812
$15,000 133,392 $3,046 377 $96,586 10,188 $(-2,682) (-134) $15,000
133,392
kWh
$3,046
377
kW-months/year
$96,586
10,188
MMBtu
$(-2,682)
(-134)
MMBtu
TOTAL IMPLEMENTED Savings:
$1,744
Cost:
$100
$1,402 12,468 $342 40 - - - - $1,402
12,468
kWh
$342
40
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG