Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2007 |
Principal Product | Investment Castings |
NAICS | 331410 - Nonferrous Metal (except Aluminum) Smelting and Refining |
SIC | 3339 - Primary Nonferrous Metals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 200,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $496,733 | 5,664,240 | kWh | $0.09 |
Electricity Demand | $166,986 | 15,372 | kW-months/year | $10.86 |
Electricity Fees | $39,414 | - | $ | - |
Natural Gas | $301,252 | 25,304 | MMBtu | $11.91 |
TOTAL ENERGY COSTS | $1,004,385 | |||
RECOMMENDED SAVINGS* | $112,228 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,679 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $6,853 Cost: - |
- | - | - | - | - | - | $6,853 | 588 |
- - kWh |
- - kW-months/year |
- - $ |
$6,853 588 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,603 Cost: $150 |
$5,641 | 64,650 | $962 | 89 | - | - | - | - |
$5,641 64,650 kWh |
$962 89 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,755 Cost: - |
$1,755 | 23,554 | - | - | - | - | - | - |
$1,755 23,554 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $19,139 Cost: $10,019 |
$19,139 | 259,384 | - | - | - | - | - | - |
$19,139 259,384 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,490 Cost: $1,992 |
$2,819 | 32,303 | $671 | 62 | - | - | - | - |
$2,819 32,303 kWh |
$671 62 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $725 Cost: $757 |
$725 | 8,309 | - | - | - | - | - | - |
$725 8,309 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $7,644 Cost: $8,646 |
$13,416 | 153,753 | $2,393 | 221 | - | - | $(-8,165) | (-686) |
$13,416 153,753 kWh |
$2,393 221 kW-months/year |
- - $ |
$(-8,165) (-686) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $2,042 Cost: $2,339 |
$2,042 | 23,404 | - | - | - | - | - | - |
$2,042 23,404 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2514 COVER OPEN TANKS |
Savings: $12,984 Cost: $14,940 |
$12,984 | 148,792 | - | - | - | - | - | - |
$12,984 148,792 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,554 Cost: $4,281 |
$3,554 | 40,732 | - | - | - | - | - | - |
$3,554 40,732 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $31,597 Cost: $52,080 |
- | - | - | - | - | - | $31,597 | 2,653 |
- - kWh |
- - kW-months/year |
- - $ |
$31,597 2,653 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $3,302 Cost: $9,569 |
$2,235 | 25,609 | $1,067 | 99 | - | - | - | - |
$2,235 25,609 kWh |
$1,067 99 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $335 Cost: $980 |
$335 | 3,844 | - | - | - | - | - | - |
$335 3,844 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,454 Cost: $11,000 |
- | - | - | - | - | - | $3,454 | 290 |
- - kWh |
- - kW-months/year |
- - $ |
$3,454 290 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $8,751 Cost: $37,915 |
- | - | - | - | $8,751 | - | - | - |
- - kWh |
- - kW-months/year |
$8,751 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $112,228 Cost: $154,668 |
$64,645 | 784,334 | $5,093 | 471 | $8,751 | - | $33,739 | 2,845 | $64,645 784,334 kWh |
$5,093 471 kW-months/year |
$8,751 - $ |
$33,739 2,845 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,679 Cost: $16,599 |
$11,088 | 130,507 | $1,738 | 161 | - | - | $6,853 | 588 | $11,088 130,507 kWh |
$1,738 161 kW-months/year |
- - $ |
$6,853 588 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |