IAC logo
IAC Assessment: SF0351
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0351
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2008
Principal Product Elastomeric Rubber Products
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 160,000
Annual Production 1 Units
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,471 1,630,247 kWh $0.12
Electricity Demand $31,245 7,072 kW-months/year $4.42
Electricity Fees $3,869 - $ -
Natural Gas $279,459 30,681 MMBtu $9.11
TOTAL ENERGY COSTS $509,044
RECOMMENDED SAVINGS* $43,508 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,743
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,571
Cost:
-
- - - - $3,571 392 -
-
kWh
-
-
kW-months/year
$3,571
392
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,336
Cost:
-
$3,336 31,991 - - - - $3,336
31,991
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,240
Cost:
$150
$2,785 23,346 $455 71 - - $2,785
23,346
kWh
$455
71
kW-months/year
-
-
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,173
Cost:
-
$1,173 6,837 - - - - $1,173
6,837
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$584
Cost:
-
$584 4,900 - - - - $584
4,900
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,396
Cost:
$290
$1,941 16,268 $455 71 - - $1,941
16,268
kWh
$455
71
kW-months/year
-
-
MMBtu
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,173
Cost:
$228
$1,173 6,837 - - - - $1,173
6,837
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$685
Cost:
$503
- - - - $685 74 -
-
kWh
-
-
kW-months/year
$685
74
MMBtu
09: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$1,877
Cost:
$2,802
- - - - $1,877 206 -
-
kWh
-
-
kW-months/year
$1,877
206
MMBtu
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,144
Cost:
$1,792
$1,144 9,587 - - - - $1,144
9,587
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$493
Cost:
$979
- - - - $493 54 -
-
kWh
-
-
kW-months/year
$493
54
MMBtu
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,836
Cost:
$93,064
$19,928 167,057 $3,908 610 - - $19,928
167,057
kWh
$3,908
610
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,508
Cost:
$99,808
$32,064 266,823 $4,818 752 $6,626 726 $32,064
266,823
kWh
$4,818
752
kW-months/year
$6,626
726
MMBtu
TOTAL IMPLEMENTED Savings:
$30,743
Cost:
$93,064
$23,264 199,048 $3,908 610 $3,571 392 $23,264
199,048
kWh
$3,908
610
kW-months/year
$3,571
392
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas