IAC logo
IAC Assessment: SF0352
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0352
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2008
Principal Product Coffee and teas
NAICS 311920 - Coffee and Tea Manufacturing
SIC 2095 - Roasted Coffee
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 50,000
Annual Production 8,000,000 Pounds
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,676 546,733 kWh $0.14
Electricity Demand $13,220 1,687 kW-months/year $7.84
Electricity Fees $7,328 - $ -
Natural Gas $62,138 5,312 MMBtu $11.70
TOTAL ENERGY COSTS $158,362
RECOMMENDED SAVINGS* $11,699 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$651
Cost:
$664
$455 3,286 $196 25 $455
3,286
kWh
$196
25
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,436
Cost:
$3,094
$2,075 14,984 $361 46 $2,075
14,984
kWh
$361
46
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,354
Cost:
$1,767
$1,354 9,773 - - $1,354
9,773
kWh
-
-
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$405
Cost:
$738
$319 2,303 $86 11 $319
2,303
kWh
$86
11
kW-months/year
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,195
Cost:
$21,950
$5,195 37,506 - - $5,195
37,506
kWh
-
-
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,658
Cost:
$9,606
$1,321 9,538 $337 43 $1,321
9,538
kWh
$337
43
kW-months/year
TOTAL RECOMMENDED Savings:
$11,699
Cost:
$37,819
$10,719 77,390 $980 125 $10,719
77,390
kWh
$980
125
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand