IAC logo
IAC Assessment: SF0356
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0356
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2008
Principal Product Bottled Wine
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $100,000,000-$500,000,000
# of Employees 241
Plant Area (Sq.Ft.) 230,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 4,020
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $401,548 16,890 kWh $23.77
Electricity Demand $153,417 11,671 kW-months/year $13.15
Electricity Fees $13,195 - $ -
Natural Gas $151,347 15,169 MMBtu $9.98
TOTAL ENERGY COSTS $732,962
RECOMMENDED SAVINGS* $138,296 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,092
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,321
Cost:
$150
$5,321 52,472 - - - - - - $5,321
52,472
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$41,503
Cost:
-
- - - - - - $41,503 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$41,503
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,655
Cost:
$6,281
$6,655 80,413 - - - - - - $6,655
80,413
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,504
Cost:
$3,760
- - - - $2,504 244 - - -
-
kWh
-
-
kW-months/year
$2,504
244
MMBtu
-
-
$
05: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$17,740
Cost:
$26,898
$17,740 213,716 - - - - - - $17,740
213,716
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,472
Cost:
$80,535
$23,011 280,345 $14,461 1,021 - - - - $23,011
280,345
kWh
$14,461
1,021
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$4,534
Cost:
$10,979
$3,897 43,924 $637 136 - - - - $3,897
43,924
kWh
$637
136
kW-months/year
-
-
MMBtu
-
-
$
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$1,532
Cost:
$4,549
$1,532 19,975 - - - - - - $1,532
19,975
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,225
Cost:
$40,545
$9,695 118,119 $2,530 539 - - - - $9,695
118,119
kWh
$2,530
539
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,810
Cost:
$36,311
$6,727 8,959 $2,083 147 - - - - $6,727
8,959
kWh
$2,083
147
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$138,296
Cost:
$210,008
$74,578 817,923 $19,711 1,843 $2,504 244 $41,503 - $74,578
817,923
kWh
$19,711
1,843
kW-months/year
$2,504
244
MMBtu
$41,503
-
$
TOTAL IMPLEMENTED Savings:
$74,092
Cost:
$154,259
$57,101 692,593 $16,991 1,560 - - - - $57,101
692,593
kWh
$16,991
1,560
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost