IAC logo
IAC Assessment: SF0389
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0389
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2010
Principal Product Treated Wastewater
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales <$500,000
# of Employees 56
Plant Area (Sq.Ft.) 962,737
Annual Production 6,205,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $192,346 2,131,791 kWh $0.09
Electricity Demand $173,227 13,476 kW-months/year $12.85
Natural Gas $487,708 74,175 MMBtu $6.58
TOTAL ENERGY COSTS $853,281
RECOMMENDED SAVINGS* $44,307 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,307
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$10,049
Cost:
$400
$8,208 90,967 $1,841 144 - - - - $8,208
90,967
kWh
$1,841
144
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$255
Cost:
$31
$209 2,318 $46 4 - - - - $209
2,318
kWh
$46
4
kW-months/year
-
-
$
-
-
$
03: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$6,873
Cost:
$2,392
$5,751 63,733 $1,122 88 - - - - $5,751
63,733
kWh
$1,122
88
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$953
Cost:
$672
$158 1,751 $31 2 $470 - $294 - $158
1,751
kWh
$31
2
kW-months/year
$470
-
$
$294
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,157
Cost:
$2,712
$2,510 27,823 $647 50 - - - - $2,510
27,823
kWh
$647
50
kW-months/year
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,881
Cost:
$7,273
$3,917 43,411 $964 76 - - - - $3,917
43,411
kWh
$964
76
kW-months/year
-
-
$
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$11,135
Cost:
$19,068
$8,010 88,774 $3,125 244 - - - - $8,010
88,774
kWh
$3,125
244
kW-months/year
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,881
Cost:
$9,823
$2,402 26,625 $479 36 - - - - $2,402
26,625
kWh
$479
36
kW-months/year
-
-
$
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,274
Cost:
$8,179
$1,903 21,090 $371 29 - - - - $1,903
21,090
kWh
$371
29
kW-months/year
-
-
$
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,037
Cost:
$9,053
$867 9,608 $170 13 - - - - $867
9,608
kWh
$170
13
kW-months/year
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$812
Cost:
$7,156
$679 7,526 $133 10 - - - - $679
7,526
kWh
$133
10
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$44,307
Cost:
$66,759
$34,614 383,626 $8,929 695 $470 - $294 - $34,614
383,626
kWh
$8,929
695
kW-months/year
$470
-
$
$294
-
$
TOTAL IMPLEMENTED Savings:
$44,307
Cost:
$66,759
$34,614 383,626 $8,929 695 $470 - $294 - $34,614
383,626
kWh
$8,929
695
kW-months/year
$470
-
$
$294
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost