IAC logo
IAC Assessment: SF0393
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0393
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2011
Principal Product Liquid Milk
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 385
Plant Area (Sq.Ft.) 41,000
Annual Production 22,000 Thousand Gallons
Production Hrs. Annual 8,112
Location (State) HI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,035,721 5,895,486 kWh $0.18
Electricity Demand $166,405 12,373 kW-months/year $13.45
Electricity Fees $26,736 - $ -
Natural Gas $314,339 13,907 MMBtu $22.60
TOTAL ENERGY COSTS $1,543,201
RECOMMENDED SAVINGS* $328,667 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $163,858
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,408
Cost:
$720
$7,408 42,164 - - - - $7,408
42,164
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$99,396
Cost:
$33,822
- - - - $99,396 4,398 -
-
kWh
-
-
kW-months/year
$99,396
4,398
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,385
Cost:
$4,330
$6,385 36,343 - - - - $6,385
36,343
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,791
Cost:
$1,329
$1,791 10,195 - - - - $1,791
10,195
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$153,800
Cost:
$220,659
$132,585 756,163 $21,215 1,560 - - $132,585
756,163
kWh
$21,215
1,560
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,218
Cost:
$19,157
$9,218 52,467 - - - - $9,218
52,467
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$32,171
Cost:
$34,310
- - - - $32,171 1,423 -
-
kWh
-
-
kW-months/year
$32,171
1,423
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,132
Cost:
$17,178
- - - - $6,132 271 -
-
kWh
-
-
kW-months/year
$6,132
271
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,350
Cost:
$25,921
$9,350 37,450 - - - - $9,350
37,450
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,016
Cost:
$14,478
$3,016 13,890 - - - - $3,016
13,890
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$328,667
Cost:
$371,904
$169,753 948,672 $21,215 1,560 $137,699 6,092 $169,753
948,672
kWh
$21,215
1,560
kW-months/year
$137,699
6,092
MMBtu
TOTAL IMPLEMENTED Savings:
$163,858
Cost:
$130,759
$26,159 129,847 - - $137,699 6,092 $26,159
129,847
kWh
-
-
kW-months/year
$137,699
6,092
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas