Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2011
Principal Product Decorative Trim Moldings
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 24
Plant Area (Sq.Ft.) 57,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $290,180 3,067,724 kWh $0.09
Electricity Demand $140,267 10,320 kW-months/year $13.59
Electricity Fees $30,626 - $ -
TOTAL ENERGY COSTS $464,967
RECOMMENDED SAVINGS* $54,327 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,461
Cost:
-
$1,461 15,764 - - $1,461
15,764
kWh
-
-
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,739
Cost:
$5,292
$12,739 104,738 - - $12,739
104,738
kWh
-
-
kW-months/year
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,247
Cost:
$790
$3,247 35,024 - - $3,247
35,024
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,009
Cost:
$11,288
$16,009 131,637 - - $16,009
131,637
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,392
Cost:
$2,205
$2,392 25,808 - - $2,392
25,808
kWh
-
-
kW-months/year
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$443
Cost:
$1,057
$443 3,270 - - $443
3,270
kWh
-
-
kW-months/year
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,415
Cost:
$25,369
$4,858 52,410 $1,557 103 $4,858
52,410
kWh
$1,557
103
kW-months/year
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,621
Cost:
$39,987
$11,621 114,150 - - $11,621
114,150
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$54,327
Cost:
$85,988
$52,770 482,801 $1,557 103 $52,770
482,801
kWh
$1,557
103
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand