Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2011 |
Principal Product | Fresh Mozzarella |
NAICS | 311513 - Cheese Manufacturing |
SIC | 2022 - Cheese, Natural And Processed |
Sales | $50,000,000-$100,000,000 |
# of Employees | 460 |
Plant Area (Sq.Ft.) | 50,700 |
Annual Production | 11,000,000 Pounds |
Production Hrs. Annual | 6,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $360,826 | 4,765,832 | kWh | $0.08 |
Electricity Demand | $240,706 | 14,238 | kW-months/year | $16.91 |
Electricity Fees | $32,924 | - | $ | - |
Natural Gas | $158,640 | 30,906 | MMBtu | $5.13 |
TOTAL ENERGY COSTS | $793,096 | |||
RECOMMENDED SAVINGS* | $69,071 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,807 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $2,708 Cost: - |
- | - | - | - | $2,708 | 528 |
- - kWh |
- - kW-months/year |
$2,708 528 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,243 Cost: - |
$2,243 | 30,108 | - | - | - | - |
$2,243 30,108 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $257 Cost: $22 |
$170 | 2,154 | $87 | 5 | - | - |
$170 2,154 kWh |
$87 5 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $17,934 Cost: $5,426 |
- | - | - | - | $17,934 | 3,440 |
- - kWh |
- - kW-months/year |
$17,934 3,440 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,812 Cost: $2,778 |
$5,812 | 78,023 | - | - | - | - |
$5,812 78,023 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $16,688 Cost: $12,500 |
$12,730 | 170,879 | $3,958 | 234 | - | - |
$12,730 170,879 kWh |
$3,958 234 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,681 Cost: $5,213 |
$3,962 | 53,175 | $2,719 | 161 | - | - |
$3,962 53,175 kWh |
$2,719 161 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $697 Cost: $1,356 |
$435 | 5,844 | $262 | 15 | - | - |
$435 5,844 kWh |
$262 15 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $483 Cost: $901 |
$268 | 3,595 | $215 | 13 | - | - |
$268 3,595 kWh |
$215 13 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $676 Cost: $1,569 |
$333 | 4,467 | $343 | 20 | - | - |
$333 4,467 kWh |
$343 20 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,910 Cost: $55,222 |
$8,287 | 111,236 | $2,623 | 155 | - | - |
$8,287 111,236 kWh |
$2,623 155 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,982 Cost: $20,358 |
- | - | - | - | $3,982 | 776 |
- - kWh |
- - kW-months/year |
$3,982 776 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $69,071 Cost: $105,345 |
$34,240 | 459,481 | $10,207 | 603 | $24,624 | 4,743 | $34,240 459,481 kWh |
$10,207 603 kW-months/year |
$24,624 4,743 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,807 Cost: $8,373 |
$3,181 | 42,573 | $692 | 41 | $17,934 | 3,440 | $3,181 42,573 kWh |
$692 41 kW-months/year |
$17,934 3,440 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |