Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2012 |
Principal Product | Candy(Chocolate and Yogurt) |
NAICS | 311352 - Confectionery Manufacturing from Purchased Chocolate |
SIC | 2064 - Candy & Other Confectionery Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 2,000,000 Units |
Production Hrs. Annual | 6,936 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $531,380 | 7,979,320 | kWh | $0.07 |
Electricity Demand | $302,644 | 17,088 | kW-months/year | $17.71 |
Natural Gas | $233,179 | 47,236 | MMBtu | $4.94 |
TOTAL ENERGY COSTS | $1,067,203 | |||
RECOMMENDED SAVINGS* | $169,847 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,836 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,385 Cost: - |
$7,385 | 110,890 | - | - | - | - |
$7,385 110,890 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $10,401 Cost: - |
$6,314 | 94,806 | - | - | $4,087 | 828 |
$6,314 94,806 kWh |
- - kW-months/year |
$4,087 828 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $2,483 Cost: - |
- | - | - | - | $2,483 | 503 |
- - kWh |
- - kW-months/year |
$2,483 503 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $17,629 Cost: $818 |
$12,074 | 181,291 | $5,555 | 313 | - | - |
$12,074 181,291 kWh |
$5,555 313 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $7,567 Cost: $3,773 |
$5,183 | 77,822 | $2,384 | 134 | - | - |
$5,183 77,822 kWh |
$2,384 134 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $1,352 Cost: $1,460 |
$926 | 13,903 | $426 | 24 | - | - |
$926 13,903 kWh |
$426 24 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $90,076 Cost: $288,023 |
$62,725 | 941,818 | $27,351 | 1,544 | - | - |
$62,725 941,818 kWh |
$27,351 1,544 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) |
Savings: $25,304 Cost: $93,999 |
$2,684 | 40,305 | $1,239 | 70 | $21,381 | 4,331 |
$2,684 40,305 kWh |
$1,239 70 kW-months/year |
$21,381 4,331 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $2,696 Cost: $10,439 |
- | - | - | - | $2,696 | 546 |
- - kWh |
- - kW-months/year |
$2,696 546 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,954 Cost: $21,408 |
$2,630 | 39,486 | $2,324 | 131 | - | - |
$2,630 39,486 kWh |
$2,324 131 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $169,847 Cost: $419,920 |
$99,921 | 1,500,321 | $39,279 | 2,217 | $30,647 | 6,208 | $99,921 1,500,321 kWh |
$39,279 2,217 kW-months/year |
$30,647 6,208 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,836 Cost: $3,773 |
$18,882 | 283,518 | $2,384 | 134 | $6,570 | 1,331 | $18,882 283,518 kWh |
$2,384 134 kW-months/year |
$6,570 1,331 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |